03/03/2026
St Ignatius of Loyola Catholic College Stage 2 is complete, and opened just in time for the 2026 school year!
DHC provided the structural and civil engineering for this new three-storey school building in Drury, Auckland, delivered through a design and build partnership with Savory Construction. The project includes 14 new classrooms, a dance studio, drama theatre, breakout spaces, office areas and a link bridge connecting to the existing building.
Thank you to all those involved in making this project possible.
Photo credit: Chris Dillon