Multiple buildings. Split levels. High forklift traffic between them. Food safety risks every time product moved outside during bad weather.
A pet food manufacturer needed to centralise their packing operations, but the site's varying floor levels made that a serious engineering challenge.
TEG Projects designed and delivered a centralised packing hall, connecting production buildings via a GMP-compliant enclosed bridge with integrated conveyors. Product now flows from raw ingredients through to finished goods warehousing without leaving the building.
The result: streamlined production flows, eliminated external forklift transfers, improved headcount efficiency, and full food safety and pedestrian segregation compliance — all delivered while maintaining production targets during the build.