19/10/2026
Final check before the linings go on 🚁
Ceilings done. Walls done. All filled. Then straight out the door for a look at the street.
Another new build sorted at Woodland Drive. Building new? Get us in before the plasterboard.
📞 021 265 6086
🌐 jmminsulation.co.nz