Gibbons Civil Engineering Limited

Gibbons Civil Engineering Limited We can assist you with geotechnical investigations, stormwater & wastewater designs, civil works etc

Have you recently received a letter from Council asking you to connect your septic tank to the public wastewater system?...
02/07/2026

Have you recently received a letter from Council asking you to connect your septic tank to the public wastewater system?
It can be a bit daunting if you're not sure what the next step is, but we're here to help. We can take care of the design, help with the Council requirements, and guide you through the process from start to finish.
If you've got questions or would just like to chat about your options, give us a call or send us a message. We're always happy to help.

Always great to receive positive feedback from the Council on our work.A recent review of one of our reports included th...
19/06/2026

Always great to receive positive feedback from the Council on our work.
A recent review of one of our reports included the following comment.

At Gibbons Civil Engineering, we take pride in producing clear, practical, and technically robust reports that help our clients and consenting authorities navigate complex projects efficiently.

A big thank you to our team and clients who continue to trust us with their projects.

28/05/2026

A reminder for rural property owners and lifestyle blocks:

A lot of older onsite wastewater systems and drainage setups are now coming under greater scrutiny during:

- Property sales
- Subdivision applications
- Consent applications
- Council compliance checks

Small issues can often become much bigger (and more expensive) if they aren’t identified early.

If you’re unsure about constraints on a property or development potential, it’s often worth getting advice early before committing to major costs. Give us a call.

Call now to connect with business.

Why Auckland’s Plan Change 120 Matters for Your ProjectIf you’re working in Auckland, Plan Change 120 (PC120) isn’t just...
18/02/2026

Why Auckland’s Plan Change 120 Matters for Your Project

If you’re working in Auckland, Plan Change 120 (PC120) isn’t just another regulation — it affects how your site is assessed for flooding, stormwater, wastewater, and geotechnical risk.

Here’s what I see regularly:

Flooding: PC120 requires that developments consider the 1% AEP plus climate change. This often uncovers risks on sites that were previously assumed “safe.”

Stormwater & wastewater: Treatment and detention requirements are tighter, and councils are looking for proof that your system can handle peak events.

Geotechnical: Saturated soils, slope stability, and erosion risks need careful evaluation to meet the new standards.

Ignoring PC120 can slow consent, increase cost, or create design changes late in the process. Understanding it early — and having detailed assessments — keeps projects on track.

We regularly help clients navigate these challenges and provide flood, stormwater, wastewater, and geotech guidance that councils trust. If you’re starting a project or need a reality check on your design, I’m happy to help.

13/05/2025

It is unusual for our entire engineering team to be simultaneously engaged in site visits, all working on different projects. Our two senior engineers are currently overseeing the construction monitoring of commercial wastewater systems installations at two separate locations. Both projects required resource consent and posed challenges, so we are pleased to have progressed to the monitoring phase. Another engineer is assessing a wastewater system that is no longer fit for purpose, with the owner seeking to upgrade. This assessment involves site testing and location option discussions with the owner. We also have an engineer conducting geotechnical site investigations on a rural site for a new build. GCEL has been engaged to prepare a geotechnical report and designs for stormwater and wastewater systems for a Building Consent application. Fortunately, the weather is favorable today.

Celebrating 5 years of working from our Waiuku Office (with 4 staff birthdays as well)
09/09/2024

Celebrating 5 years of working from our Waiuku Office
(with 4 staff birthdays as well)

Are your stormwater systems not coping when it rains heavily? If it is not managed correctly, this can cause the ground ...
11/06/2024

Are your stormwater systems not coping when it rains heavily?
If it is not managed correctly, this can cause the ground and foundations to become destabilized.
If you have any concerns, we can assess your property, commercial or residential, and provide you with solutions which will help mitigate further damage caused by heavy rains.
We’re based in Waiuku but cover all of Franklin and beyond, so please give us a call on 09 600 2332

20/12/2023

Well that's a wrap for 2023. We're now taking a break to enjoy this summer weather. Thanks to everyone who's worked with us this year. We'll be back in the office on 15th January 2024.
Have a Merry Christmas and safe travels.

Auckland Council are now recording how frequently your wastewater system is checked and you may have recently received a...
13/12/2023

Auckland Council are now recording how frequently your wastewater system is checked and you may have recently received a letter from them.

We thought it'd be a timely reminder to you all that if you are having any issues with your wastewater system, we have a specialist Civil Engineer who can assist you with any questions you may have.

Call us on 09 600 2332 to discuss your concerns.

Address

112 Cameron Road
Waiuku
2681

Opening Hours

Monday 9am - 4pm
Tuesday 9am - 4pm
Wednesday 9am - 4pm
Thursday 9am - 4pm

Telephone

+6496002332

Alerts

Be the first to know and let us send you an email when Gibbons Civil Engineering Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Gibbons Civil Engineering Limited:

Shortcuts

Share