Moog Controls Corporation

Moog Controls Corporation This is the official page of Moog Controls Corporation Philippine Branch.

At Moog, our commitment to People, Community, and Planet isn’t a standalone initiative. It’s integrated into how we oper...
15/05/2026

At Moog, our commitment to People, Community, and Planet isn’t a standalone initiative. It’s integrated into how we operate, innovate, and serve customers around the world.

At Moog, our commitment to People, Community, and Planet isn’t a standalone initiative. It’s integrated into how we operate, innovate, and serve customers around the world.

Our 2025 Sustainability Report tells a story of meaningful advancement across our environmental and social priorities, and of the people who make it possible. Find the report on our website: https://loom.ly/JTtCTKA

08/05/2026

INVITATION TO BID

Moog Controls Corporation (Philippine Branch) invites interested companies to submit their bid for the FIRE DETECTION AND ALARM SYSTEM (FDAS): ADDITIONAL DEVICES AND NOTIFICATION APPLIANCES INSTALLATION– PHASE 2 AT MOOG CONTROLS CORPORATION as per the following details.

PROJECT/SERVICE SUMMARY:
The project involves the supply, installation, testing, commissioning, and integration of additional fire detection and alarm system (FDAS) devices for the existing Honeywell Notifier FDAS installed at Moog Controls Corporation (Philippine Branch).

The scope of work includes the provision of compatible addressable smoke detectors, heat detectors, modules, notification devices, wiring materials, conduits, accessories, and other related components required to expand and integrate with the existing FDAS network. Civil, piping, mounting, and scaffolding works, as applicable, shall also form part of the project.

The contractor shall ensure that all newly installed devices are fully compatible with the existing Honeywell Notifier system and that the expansion works will not disrupt current FDAS operations. The project shall include system programming, loop configuration, testing, troubleshooting, and final commissioning to verify proper operation and compliance with applicable standards.

All works shall comply with the latest applicable requirements of NFPA 72, Philippine Electrical Code (PEC), local fire safety regulations, PEZA requirements, and other relevant industry standards. The contractor shall provide complete documentation including as-built drawings, testing and commissioning reports, and operator orientation upon project completion.

GENERAL REQUIREMENTS:
• Must be able to provide fire detection and alarm system (FDAS) system materials, services, tools/instruments and testing equipment. These include civil works, piping, and scaffolding works.
• Must be able to provide a Notifier by Honeywell brand of FDAS.
• Has at least five (5) similar project experiences in the FDAS for an industrial setting.
• Has a designated safety officer (SO2), and an Electrical/Electronic Engineer with experience in supervision, testing and commissioning of FDAS.
• Must have a licensed NC2 scaffolder erector and inspector.
• To be able to prepare Job Hazard Analysis (JHA), methodology and project plan.
• Duly registered business entity with the appropriate government agencies.
• Must be able to comply with the minimum requirements of NFPA 72, 1, 101, PEC, and other relevant FDAS standards.
• Must be able to comply with PEZA and DOLE Engineering permit requirements and processing.

SITE VISIT (As Applicable)
• To be advised.

BID DOCUMENTS:
A. Letter of Intent
B. Supplier’s Credentials:
i. Company Profile
ii. Business Registration (SEC or DTI)
iii. BIR Registration
iv. Latest Audited Financial Statements
v. Other pertinent documents
 PCAB License
 Valid Business Permit
 OSCH Certificate
 SO Certificate

BID CONDITIONS AND DUE DATE:

All bid documents must be submitted to MCC no later than May 22, 2026 either via sealed documents (hard copy) or electronic copy via email.

vi. For sealed documents, the envelope shall be labeled as follows:
Attention to: Supply Chain Manager
Moog Controls Corporation
BCEZ, Loakan Road, Baguio City
Philippines 2600
Bid Proposal for PROJECT/SERVICE CONTRACT
From: (company name of bidder)
Address: (company address)
Contact Information: (name, mobile and/or landline)

vii. For electronic copy, send the bid documents to [email protected] and [email protected] using email subject format “BID_Proposal for FDAS: ADDITIONAL DEVICES AND NOTIFICATION APPLIANCES INSTALLATION– PHASE 2 Bidding Company Name”. Attachment must be in PDF file based BID DOCUMENTS.

Documents and proposals received after the due date stated above will not be considered.

By submitting a proposal, each bidder acknowledge that they understand the requirements and are capable of performing the work as stated in the statement of work sent together with this invitation.

BID RESULT:

Bid result will be confirmed through notice of award / notice of regret via nominated email address.

16/04/2026

INVITATION TO BID

Moog Controls Corporation (Philippine Branch) invites interested companies to submit their bid for the RENOVATION OF CANTEEN AT MAIN CAMPUS - AG as per the following details.

PROJECT/SERVICE SUMMARY:
The primary goal of this project is to renovate the existing canteen, highlighted by the addition of a new alfresco dining area. This expansion will increase seating capacity from 125 to 175. Beyond a refreshed aesthetic, the renovation strategically addresses long-standing issues with traffic flow, plumbing, and sanitary infrastructure. The new design incorporates a modern, sustainable aesthetic that prioritizes natural light and efficient service, ensuring a safer and more enjoyable dining experience for all users.
___________________________________________________________________________________

GENERAL REQUIREMENTS:

• Must be able to supply all materials and labor required to complete the project and all works stated in the scope of work.
• Must be able to handle design, engineering, procurement and construction of the canteen renovation.
• Must have experience in architectural, civil and MEPFS engineering, procurement and construction.
• Has at least three (3) similar project experiences in renovation of spaces for canteen/kitchen setting.
• Has the skilled personnel with experience in supervision, engineering, procurement and construction.
• Must be able to design the most energy and water efficient options for the project.
• Must be able to prepare Job Hazard Analysis (JHA), methodology and project plan.
• Must be a duly registered business entity with the appropriate government agencies.
• Must be able to comply with the minimum requirements of appropriate codes and standards.
• Must be able to comply with PEZA and DOLE permit requirements and processing.
• Must have Safety Officer and skilled personnel.
• Must have PCAB License – General Construction.

BID DOCUMENTS:
A. Letter of Intent
B. Supplier’s Credentials:
i. Company Profile
ii. Business Registration (SEC or DTI)
iii. BIR Registration
iv. PCAB License - GenCon
v. Latest Audited Financial Statements
vi. Other pertinent documents
 Valid Business Permit
 OSCH Certificate
 SO certificate
C. Signed Invitation to Bid by authorized company representative
D. Signed Statement of Work by authorized company representative

BID CONDITIONS AND DUE DATE:

All bid documents must be submitted to MCC no later than April 27, 2026 either via sealed documents (hard copy) or electronic copy via email.

i. For sealed documents, the envelope shall be labeled as follows:
Attention to: Supply Chain Manager
Moog Controls Corporation
BCEZ, Loakan Road, Baguio City
Philippines 2600

Bid Proposal for PROJECT/SERVICE CONTRACT
From: (company name of bidder)
Address: (company address)
Contact Information: (name, mobile and/or landline)

ii. For electronic copy, send the bid documents to [email protected] using email subject format “BID_Proposal for RENOVATION OF CANTEEN AT MAIN CAMPUS - AG_Bidding Company Name”. Attachment must be in PDF file based BID DOCUMENTS.

Documents and proposals received after the due date stated above will not be considered.

By submitting a proposal, each bidder acknowledge that they understand the requirements and are capable of performing the work as stated in the statement of work sent together with this invitation.

BID RESULT:

Bid result will be confirmed through notice of award / notice of regret via nominated email address.

16/04/2026

INVITATION TO BID

Moog Controls Corporation (Philippine Branch) invites interested companies to submit their bid for the BAGUIO INDUSTRIAL GROUP RESTROOM MODERNIZATION PROJECT as per the following details.

PROJECT/SERVICE SUMMARY:
Project Overview: Enhanced Restrooms
What we're doing: We are modernizing three restrooms here at Moog Baguio to give everyone a better experience.
Timeline: The work will be carried out in two separate phases to minimize disruption.
Key focus: The upgrade emphasizes a modern design and improved energy conservation, making the facilities more comfortable and efficient.
__________________________________________________________________________________.

GENERAL REQUIREMENTS:
 Must be able to provide materials, services, tools/instruments and equipment needed for design and build projects for buildings
 Has specialty in design and construction with at least three (3) similar project experiences
 Has a designated SAFETY OFFICE and ENGINEER with experience in supervision in construction
 Must be able to prepare Job Hazard Analysis (JHA), APPROVED LIFTING METHODOLOGY, and PROJECT PLAN
 Must be a duly registered business entity with the appropriate government agencies.
 Must be able to comply with Philippine Codes (National Structural Code, National Building Code, NFPA, Philippine Electrical Code, Philippine Mechanical Code)
 Must be able to comply with PEZA permitting requirements and processing.
 Must have Contractors’ All-Risk Insurance
 Must have Standard Requirement for Project Mobilization and Demobilization
 Permitting Needed:
o PEZA Permit-to-Operate (Architectural) - (Signed and Sealed Plans are to be provided by Moog for reference), Data Sheets, Commissioning and acceptance reports, Printing and Processing Fee)
o PEZA Permit-to-Operate (Mechanical) - (Signed and Sealed Plans are to be provided by Moog for reference), Data Sheets, Commissioning and acceptance reports, Printing and Processing Fee)
o PEZA Permit-to-Operate (Electrical) - (Signed and Sealed Plans are to be provided by Moog for reference), Data Sheets, Commissioning and acceptance reports, Printing and Processing Fee)
o PEZA Permit-to-Operate (Plumbing) - (Signed and Sealed Plans are to be provided by Moog for reference), Data Sheets, Commissioning and acceptance reports, Printing and Processing Fee)
 For construction of three IG restrooms in two Phases (Phase 1 and Phase 2) as specified in the SOW. Bid in two separate Phases.
 Activity/Work Proper:
o Area Preparation and Excavation Works for Re-piping, Plumbing, Mechanical, Concreting, Lighting Fixtures, Painting Works and Scaffolding Works
o Integration to the Rainwater Collection System – Phase 1 Restroom Southeast Side

BID DOCUMENTS:
A. Letter of Intent
B. Supplier’s Credentials:
i. Company Profile
ii. Business Registration (SEC or DTI)
iii. BIR Registration
iv. Latest Audited Financial Statements
v. Other pertinent documents
 Valid Business Permit
 OSCH Certificate
 SO certificate
 PCAB – For construction works

BID CONDITIONS AND DUE DATE:

All bid documents must be submitted to MCC no later than April 30, 2026 either via sealed documents (hard copy) or electronic copy via email.

vi. For sealed documents, the envelope shall be labeled as
follows:

Attention to: Supply Chain Manager
Moog Controls Corporation
BCEZ, Loakan Road, Baguio City
Philippines 2600

Bid Proposal for PROJECT/SERVICE CONTRACT
From: (company name of bidder)
Address: (company address)
Contact Information: (name, mobile and/or landline)

vii. For electronic copy, send the bid documents to
[email protected] using email subject format “BID_Proposal for
BAGUIO INDUSTRIAL GROUP RESTROOM MODERNIZATION
PROJECT Bidding Company Name”. Attachment must be in PDF
file based BID DOCUMENTS.

Documents and proposals received after the due date stated above will not be considered.

By submitting a proposal, each bidder acknowledge that they understand the requirements and are capable of performing the work as stated in the statement of work sent together with this invitation.

BID RESULT:
Bid result will be confirmed through notice of award / notice of regret via nominated email address.

08/04/2026

INVITATION TO BID

Moog Controls Corporation (Philippine Branch) invites interested companies to submit their bid for the GENSET SYNCHRONIZATION as per the following details.

PROJECT/SERVICE SUMMARY:

This project covers the synchronization of three (3) units of 480V, 3 phase, 60Hz Emergency Diesel Generators installed at Moog Controls Corporation, Loakan Road, Baguio City. The Contractor shall supply, install, integrate, test, and commission a complete Generator Synchronization System, including the synchronization panel, associated instrumentation, circuit breakers, control devices, protection relays, power cable and cable tray installation, interconnection wiring, and all other components necessary to achieve a fully functional synchronized generator system.

The Contractor shall also perform a comprehensive engineering and design analysis to evaluate the impact of generator synchronization on the existing 480V distribution system. This includes full ETAP power system studies and verification of the capability of the existing low voltage switchgear and generator control architecture. The Contractor shall validate all existing generator wiring schematics, control systems, and communication circuits, and integrate these into the proposed synchronization system to ensure proper functionality and compatibility of all equipment.
__________________________________________________________________________________

GENERAL REQUIREMENTS:

The Contractor must meet the following minimum qualifications and capabilities:

• Must be capable of providing complete engineering, design, procurement, construction, installation, testing, and commissioning services for generator synchronization systems.
• Must have the ability to develop and submit engineering drawings, including Single Line Diagrams (SLDs), control diagrams, communication diagrams, shop drawings, and design analyses.
• Must be capable of performing complete electrical integration works, including cable routing, termination, panel retrofitting, and installation of synchronization panels and instrumentation.
• Must be able to conduct full system studies including:

o Short Circuit Analysis
o Load Flow
o Protection Coordination
o Arc Flash
o Transient/Parallel Operation Analysis
o ETAP Modeling and validation

• Must have completed at least three (3) similar projects involving multi generator synchronization, power system integration, or critical electrical infrastructure work in an industrial facility.
• Must have experience working with different generator brands and control philosophies, similar to Cummins, Mitsubishi, Kohler, Aksa, or equivalent.
• Must be experienced in retrofitting generator control panels, governors, AVRs, protection relays, and integrating them with synchronization systems.
• Must have skilled technicians with proven background in generator control wiring, panel integration, testing, and commissioning
• Must have specialized tools, calibrated instruments, and power system testing equipment needed for synchronization and relay commissioning.
• Must have SO2 or SO3 safety officer, Electrical or Professional Electrical Engineer, and skilled personnel with experience in supervision, testing and commissioning of genset synchronization.
• Must be able to prepare Job Hazard Analysis (JHA), methodology and project plan.
• Must be a duly registered business entity with the appropriate government agencies.
• Must comply with all applicable standards and codes including the Philippine Electrical Code, NFPA, IEEE, ANSI, IEC, and other relevant technical and safety standards.
• Must comply with all PEZA and DOLE permit requirements, including preparation, processing, and submission of permits prior to project ex*****on.

BID DOCUMENTS:

A. Letter of Intent
B. Supplier’s Credentials:
i. Company Profile
ii. Business Registration (SEC or DTI)
iii. BIR Registration
iv. Latest Audited Financial Statements
v. Other pertinent documents
- PCAB License – if there’s a construction activity
- Valid Business Permit
- OSCH Certificate
- SO certificate

BID CONDITIONS AND DUE DATE:

All bid documents must be submitted to MCC no later than April 17, 2026, either via sealed documents (hard copy) or electronic copy via email.

i. For sealed documents, the envelope shall be labeled as follows:

Attention to: Supply Chain Manager
Moog Controls Corporation
BCEZ, Loakan Road, Baguio City
Philippines 2600

Bid Proposal for PROJECT/SERVICE CONTRACT
From: (company name of bidder)
Address: (company address)
Contact Information: (name, mobile and/or landline)

ii. For electronic copy, send the bid documents to [email protected] using email subject format “BID_Proposal for PROJECT/SERVICE CONTRACT_Bidding Company Name”. Attachment must be in PDF file based BID DOCUMENTS.

Documents and proposals received after the due date stated above will not be considered.

By submitting a proposal, each bidder acknowledge that they understand the requirements and are capable of performing the work as stated in the statement of work sent together with this invitation.

BID RESULT:

Bid result will be confirmed through notice of award / notice of regret via nominated email address.

19/11/2025

INVITATION TO BID

Moog Controls Corporation (Philippine Branch) invites interested companies to submit their bid for the Kadaclan Warehouse Mezzanine Renovation Project at Moog Baguio - Industrial Campus as per the following details.

PROJECT/SERVICE SUMMARY:

This Warehouse Mezzanine aims to address the safety and space concerns of the warehouse.
Safety, to ensure the safety of personnel working inside the warehouse. An increased head room clearance reduces the risk of injuries. To ensure the safety of parts stored in the warehouse. And to augment storage space that would “support” existing programs.
___________________________________________________________________________________.

GENERAL REQUIREMENTS:

• Must be able to supply all materials and labor required to complete the project and all works stated in the scope of work.
• Must be able to handle supply, installation, and commissioning of the project based on the drawings provided.
• Must have PCAB License.
• Must be able to prepare Job Hazard Analysis (JHA), methodology and project plan.
• Must be a duly registered business entity with the appropriate government agencies.
• Must be able to comply with the minimum requirements of NBC (P.D. 1095), NSCP 2015, NEC , NFPA , PME 2012 and other appropriate codes and standards.
• Must be able to comply with PEZA and DOLE permit requirements and processing.
• Must have Safety Officer and skilled personnel.

BID DOCUMENTS:

A. Proposal Letter and Bid Price/Amount
B. Supplier’s Credentials:
i. Company Profile
ii. Business Registration (SEC or DTI)
iii. BIR Registration
iv. Latest Audited Financial Statements
v. Valid PCAB license
vi. Other pertinent documents
C. Signed Invitation to Bid by authorized company representative
D. Signed Statement of Work by authorized company representative

BID CONDITIONS AND DUE DATE:

All bid documents must be submitted to MCC no later than November 21, 2025, either via sealed documents (hard copy) or electronic copy via email.

i. For sealed documents, the envelope shall be labeled as follows:
Attention to: Supply Chain Manager
Moog Controls Corporation
BCEZ, Loakan Road, Baguio City
Philippines 2600

Bid Proposal for PROJECT/SERVICE CONTRACT
From: (company name of bidder)
Address: (company address)
Contact Information: (name, mobile and/or landline)

ii. For electronic copy, send the bid documents to [email protected] using email subject format “BID_Proposal for PROJECT/SERVICE CONTRACT_Bidding Company Name”. Attachment must be in PDF file based BID DOCUMENTS.

Documents and proposals received after the due date stated above will not be considered.

By submitting a proposal, each bidder acknowledge that they understand the requirements and are capable of performing the work as stated in the statement of work sent together with this invitation.

BID RESULT:

Bid result will be confirmed through notice of award / notice of regret via nominated email address.

09/09/2025

INVITATION TO BID:

Moog Controls Corporation (Philippine Branch) invites interested companies to submit their bid for the CANTEEN CONCESSIONAIRE SERVICES as per the following details.

PROJECT/SERVICE SUMMARY:

• Maintain Moog Controls Corporation Canteen facilities located at the main facility, annex and industrial facility as conducive for canteen operation and services for on-site employees and service contractors;
• Provide quality canteen services including various options for different palates, healthy meals, other meal options and programs;
• Provide clean and healthy meals which are aligned to employee wellness goals and;
• Work hand in hand with HR Team, Facilities, Safety and Operations in addressing the vast needs for canteen services aligned to company programs and objectives on canteen services.

___________________________________________________________________________________

GENERAL REQUIREMENTS:

• Duly registered business entity with the appropriate government agencies.
• Must have an office located within the Baguio-Benguet area and must serve as a leadership center responsible for administrative and operational functions. It should be capable of making decisions and managing services directly related to the support provided to Moog Controls Corporation.
• Must be capable to provide 24-hours canteen services for seven days a week including holidays and rest days to serve 3 shift operations of the company. Number of total employees is at 1500 and around 400 service providers scattered in the 3 shift schedules with estimate below:
o 1st or day shift (7am – 5pm): 850 employees + 200 service providers
o 2nd shift (3pm – 11pm): 350 employees + 100 service providers
o 3rd shift (11pm -7am): 350 employees + 100 service providers
• Has been into professional canteen catering or services for at least three (3) years.
• With a wide range of culinary & baking expertise including international dishes
• With existing delivery vehicle designed exclusively for food to service three (3) canteen sites of Moog Controls Corporation. Meal and Snack delivery at a minimum of 2x per shift
o Main Kitchen to Annex Canteen:
 Distance: between 400 - 600 meters
 1st or day shift: +/- 300 pax
 2nd shift: +/- 150 pax
 3rd shift: +/- 150 pax
o Main Kitchen to Moog Industrial:
 Distance: around 1-1.2 kms
 1st or day shift: +/- 90 pax
 2nd shift: +/- 50 pax
 3rd shift: +/- 50 pax
• Has a designated full time Pollution Control Officer and Safety Officer who is assigned to cover for the following tasks:
o Ensure proper performance, operation, and maintenance of facilities like wastewater facilities and other control devices,
o Ensure proper hazardous waste storage, transport and solid waste management.
o Oversee operational activities affecting environmental impacts and recommend possible mitigating solutions
o Ensure proper permits and documents are updated and intact to support continuous operations.
o Ensure Safety Regulations are implemented accordingly where needed in the type of services rendered to Moog.
o Implement Safety programs and guidelines in coordination with the Safety Department.
o Participate in meetings as needed
If you believe your company complies with the abovementioned requirements, and if you are interested to participate in the bidding process, please submit the following bid documents:
BID DOCUMENTS:

1. Letter of Intent
2. Supplier’s Credentials
a. Company Profile
b. Business Registration (SEC or DTI)
c. BIR Registration
d. Latest Audited Financial Statements
e. Article of Incorporation & By-laws*for corporate
f. Updated Business permit
g. Other pertinent documents

All documents must be submitted in PDF format to [email protected] on or before September 18, 2025 with a subject title of “INVITATION TO BID: CANTEEN CONCESSIONAIRE SERVICES”.

Please note that the documents received after the due date stated above will not be considered.

Your letter will serve as our basis for us to move to the next step of the process.

05/08/2025

INVITATION TO BID

Moog Controls Corporation (Philippine Branch) is inviting qualified and experienced contractors to submit sealed bids for the Fire Protection Systems Upgrade at its Main Campus in Baguio City Economic Zone, Loakan Road, Baguio City.

PROJECT/SERVICE SUMMARY:
This project mainly covers the upgrade of fire protection infrastructure, focusing on the replacement of underground fire protection pipelines. This project is part of the company’s proactive safety enhancement program to ensure the reliability and efficiency of its fire suppression systems. And, this is part of the company’s ongoing commitment to safety, regulatory compliance, and operational excellence.

This project must comply with local standards, Philippine Mechanical Engineer Code, Fire Code of the Philippines, and NFPA 13 and other international applicable codes.
___________________________________________________________________________________.

GENERAL REQUIREMENTS:

A. Must have at least three (3) similar project experiences as a company in the installation of Fire Protection Systems.
B. Has a designated Safety Officer/Engineer and a Mechanical Engineer with experience in supervision, testing and commissioning of Fire Protection Systems. Personnel should be always available at site during project ex*****on.
C. Must be able to provide certifications, or accreditation that the company can do Mechanical Works for Fire Protection Systems.
D. Duly registered business entity with the appropriate government agencies.
E. Must be able to comply with the minimum requirements of Philippine Mechanical Engineer Code, Fire Code of the Philippines, NFPA, and other relevant standards.
F. No actual work or purchase should be done without the approval of the necessary drawings (RFA).
G. Provide a scaled, standard, and approved as-built plan after the completion of the project. The as-built plan must include mechanical drawing and interconnection diagram, general notes, map, vicinity map. Legends, typical installation, and tapping details.
H. Planning and Preparation Detailed site survey and assessment of Fire Protection Systems Fireline layout including the strategic locations of Fire Sprinkler Risers and isolation valves.
I. Existing Fire Protection Systems shall remain active until the new Fire Protection Systems are installed and functional. In case that shutdown is inevitable, contractors need to follow Moog requirements/protocols and scheduling. No work shall proceed until approval of the requirement.
J. Compliance with Moog Facilities, Security, and EHS requirements.
K. Job Hazard Analysis (JHA), Methodology, Project Plan/timeline using MS project for approval of Moog team prior to start of work.
L. Work Authorization Permit (WAP) and other special permits required to complete the work (e.g. working at heights, excavation, Hot works, Surface Pe*******on etc.).
M. Contractors must have valid certifications such as NC2 or equivalent, Engineers, and Safety officer (SO2 or SO3 depending on the requirement of standards). A Mechanical Engineer and Safety must always be present at site during work. No work shall commence without the presence of these key personnel.
N. Contractor needs to undergo safety & security orientation (2 hours) and must secure manpower entry approval before entering the plant.
O. PEZA permit, DOLE CHSP, BFP, and other government regulatory bodies. The local government fees, and BFP Fees will initially be shouldered by the contractor and will be reimbursed from Moog.
P. Contractors must follow other standards not specified but mandated by local and national standards.
Q. It is the contractor’s responsibility to conduct site inspection and verification of actual site conditions and other details in the reference drawings.
R. It is the responsibility of the contractor to provide a report to the as-found non-compliance with standards during installation work and must immediately notify project owner or Facilities. Upon verification, the additional cost to rectify these non-conformances will be subject for approval of Facilities and other Departments in Moog.
S. Supply, provide and install accessories, amenities, facility and work not cited herein but are specifically shown on Moog approved design layout and/or mentioned in the Technical Provision or other parts of the Job Specification.
T. The project timeline to complete the project upon contract signing is 120 calendar days.
U. Copy of the final report that details the complete and as-built installation drawings shall be submitted thirty (30) calendar days after the completion of all field work. The copy shall be submitted in binders and in soft copy (USB Flash Drive).
V. One (1) set of drawing files in AutoCAD 2017 or latest version in accordance with Moog standard drawing format and specification. Moog standard drawing format and specification in AutoCAD shall be provided to Contractor upon formal request.
W. The scope of work includes whatever effort is necessary to supply information required to fulfil the responsibility of the Contractor to supply data to, and to expedite coordination and cooperation with the Owner and Owner’s representative.
X. Work permits shall be secured by the Contractor from Moog all throughout the duration of the job. It is also the responsibility of the Contractor to secure means of logistic to transport its personnel to and from the job site.
Y. The Contractor shall furnish other work not explicitly cited in the specifications but is reasonably implied and always required for the completion of the work under the Job Specification such as housekeeping/clean-up of work site, restoration of damaged facilities and equipment affected during the performance of the above work, provision of Contractor’s temporary facilities, securing all necessary government permit.

BID DOCUMENTS:
A. Supplier’s Credentials:
i. Company Profile
ii. Business Registration (SEC or DTI)
iii. BIR Registration
iv. Latest Audited Financial Statements
v. Non-Disclosure Agreement
vi. Other pertinent documents

BID CONDITIONS AND DUE DATE:

All bid documents must be submitted in PDF format to [email protected], and [email protected] on or before August 15, 2025.

Documents and proposals received after the due date stated above will not be considered.

Address

Baguio City

Alerts

Be the first to know and let us send you an email when Moog Controls Corporation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share