05/07/2022
https://www.facebook.com/benguetelectric/photos/a.793219494064390/5274721469247481/?type=3
REQUIREMENTS FOR SERVICE CONNECTION
NEW, ADDITIONAL, TEMPORARY AND TEMPORARY TO PERMANENT
1. Certificate of Final Electrical Inspection or Permit for Temporary Connection with validation (from CBAO or Municipal Engineer)
2. Certification from BENECO Accredited Electrical Practitioner/Contractor certifying that the metering preparation is safe and is within BENECO's standards.
3. Electrical Plan and/or Electrical Layout (Signed and sealed by a Professional Electrical Engineer)
4. Barangay Certification showing proof of residency in the Barangay indicating complete/exact address of the applicant.
5. Photocopy of valid Identification Card (ID) with signature and picture.
6. Photocopy of the electricity bill of the neighbor.
7. Picture of the metering preparation and structure.
8. No outstanding obligation including surcharges to the Cooperative.
9. Duly accomplished forms:
1. Application for Service Connection
2. Location Sketch
3. Notarized Service Contract
4. Application for Membership
5. Subscription Agreement
10. Certificate of Attendance to the Pre-Membership Education Seminar (PMES)
Reminders:
1. All applicants are encouraged to attend the PMES before availing the services of an AEP.
2. All applications must submitted by the applicant or his/her duly authorized representative.
3. Only the applicants who attended the PMES shall be issued the Application forms.