Car Care Center

Car Care Center Care Care Service

Project  # 2 rebuilding my Trooper Gear Box. First time to refurbish that part since it was bought last 2015.
01/08/2025

Project # 2 rebuilding my Trooper Gear Box. First time to refurbish that part since it was bought last 2015.

Project  # 1Reviving a Chevrolet Lacetti/Optra with a dead ECUUpdate:Waiting for an ECU Programmer
01/08/2025

Project # 1

Reviving a Chevrolet Lacetti/Optra with a dead ECU

Update:

Waiting for an ECU Programmer

Completion of Project HYUNDAI ACCENT CRDI engine rebuild
08/12/2024

Completion of Project HYUNDAI ACCENT CRDI engine rebuild

Another work done of HYUNDAI Accent CRDIMounting of intake manifold and its other parts.
30/11/2024

Another work done of HYUNDAI Accent CRDI

Mounting of intake manifold and its other parts.

Continuation of Project: HYUNDAI Accent CRDI Engine ReconditioningDue to unavailability of spare parts locally, delayed ...
29/11/2024

Continuation of Project: HYUNDAI Accent CRDI Engine Reconditioning

Due to unavailability of spare parts locally, delayed on the project.

Hence, mounting of cylinder head, timing of camshaft, crankshaft & injection pump had just done this afternoon.

Arrival of new 8.25R20 ROADONE Tires intended for L'Casi Hardware
18/11/2024

Arrival of new 8.25R20 ROADONE Tires intended for L'Casi Hardware

Project: HYUNDAI ACCENT CRDI 1.5 Engine FixingComplaint: Low PowerFindings:1.) Black/Blue smoke emitting2.) Engine oil i...
14/11/2024

Project: HYUNDAI ACCENT CRDI 1.5 Engine Fixing

Complaint: Low Power
Findings:
1.) Black/Blue smoke emitting
2.) Engine oil in exhaust pipe

New arrival of WESTLAKE tires 155R12CLikewise, availability of other tire sizes.
01/11/2024

New arrival of WESTLAKE tires 155R12C

Likewise, availability of other tire sizes.

Project: LGU Basey Vhc HiLux (issued to PNP)Arrival & installation of left & right Lower Control Arm, Stabilizer Link, w...
26/09/2024

Project: LGU Basey Vhc HiLux (issued to PNP)

Arrival & installation of left & right Lower Control Arm, Stabilizer Link, wheel alignment (camber & toe in/out)

Project: LGU Basey Vhc (HILUX)Work to be done:1.) Replacement rust eaten Lower Control Arm (left & right) 2.) Fabricatio...
23/09/2024

Project: LGU Basey Vhc (HILUX)

Work to be done:

1.) Replacement rust eaten Lower Control Arm (left & right)

2.) Fabrication of rust eaten front body support.

Address

National Highway
Basey

Website

Alerts

Be the first to know and let us send you an email when Car Care Center posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share