29/04/2026
Sa mga naka sched po NEXT WEEK (WEDNESDAY) May 6 , Cancelled po wednesday schedules. Please check available slots if gusto po magpa rescheduleโบ๏ธโค๏ธ
๐๐๐๐ ๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐๐
๐๐ฎ๐๐ฒ:
May 6, 2026, Wednesday
๐ง๐ถ๐บ๐ฒ:
7:00 AM to 5:00 PM
๐๐ณ๐ณ๐ฒ๐ฐ๐๐ฒ๐ฑ ๐๐ฟ๐ฒ๐ฎ๐:
All barangays of:
Talavera, Sto. Domingo, Aliaga, Quezon, Licab, Munoz, Guimba, Talugtug, Lupao and Carranglan
(lahat ng nasasakupan ng NEECO II - Area 1)
๐๐ฐ๐๐ถ๐๐ถ๐๐ถ๐ฒ๐:
-To implement wood pole replacement program along Cabanatuan - San Luis 69kV line.
-To implement wood pole replacement program along Cabanatuan - Fatima 69kV line.
-Correction of oil leak of 300MVA, Transformer no. 1 (8Z-XF01CBN) at Cabanatuan SS.
-Installation of 13.8kV, surge arresters at station service no. 1 at Cabanatuan SS.
-Installation of 13.8kV, surge arresters at station service no. 1 at Cabanatuan SS.
-Preventive maintenance of relay protection.
-General maintenance of high voltage equipment.
Paalala:
Ang power interruption na ito ay ๐ต๐ถ๐ป๐ฑ๐ถ ๐๐ฎ๐ธ๐น๐ฎ๐ ๐ป๐ด ๐ธ๐ผ๐ป๐๐ฟ๐ผ๐น ng ating kooperatiba. Ito ay sa bahagi ng ๐๐ฟ๐ฎ๐ป๐๐บ๐ถ๐๐๐ถ๐ผ๐ป ๐น๐ถ๐ป๐ฒ๐ na pinangangasiwaan ng ๐ก๐ฎ๐๐ถ๐ผ๐ป๐ฎ๐น ๐๐ฟ๐ถ๐ฑ ๐๐ผ๐ฟ๐ฝ๐ผ๐ฟ๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐๐ต๐ฒ ๐ฃ๐ต๐ถ๐น๐ถ๐ฝ๐ฝ๐ถ๐ป๐ฒ๐. Wala po tayong direktang kontrol dito dahil ang ๐ฎ๐๐ถ๐ป๐ด ๐๐๐ฝ๐น๐ฎ๐ ๐ป๐ด ๐ธ๐๐ฟ๐๐ฒ๐ป๐๐ฒ ๐ฎ๐ ๐ฑ๐๐บ๐ฎ๐ฑ๐ฎ๐ฎ๐ป ๐บ๐๐ป๐ฎ ๐๐ฎ ๐ธ๐ฎ๐ป๐ถ๐น๐ฎ๐ป๐ด ๐๐ฟ๐ฎ๐ป๐๐บ๐ถ๐๐๐ถ๐ผ๐ป ๐น๐ถ๐ป๐ฒ๐ ๐ฏ๐ฎ๐ด๐ผ ๐บ๐ฎ๐ธ๐ฎ๐ฟ๐ฎ๐๐ถ๐ป๐ด ๐๐ฎ ๐ฎ๐๐ถ๐ป๐ด ๐บ๐ด๐ฎ ๐๐๐ฏ๐๐๐ฎ๐๐ถ๐ผ๐ป๐.
๐ณ๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐๐๐๐
๐๐๐๐๐๐๐ ๐๐ ๐๐๐๐๐ ๐๐๐๐ ๐๐๐๐๐
๐๐๐๐
๐๐ ๐๐๐๐๐๐
๐๐ ๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐
๐๐ ๐๐๐ ๐๐๐๐๐