𝗣𝗢𝗪𝗘𝗥 𝗔𝗗𝗩𝗜𝗦𝗢𝗥𝗬
Ref. No. 2026-PO-037
GUIMELCO will temporarily shut down its power supply for the conduct of annual Preventive Maintenance Schedule (PMS) of Zaldivar Substation at Zaldivar, Buenavista.
In line with this, there will be a SCHEDULED POWER INTERRUPTION on April 11, 2026 (Saturday) to facilitate the activity as mentioned above from 6:00AM-4:00PM.
Affected Areas:
ZALDIVAR SUBSTATION:
WHOLE OF BUENAVISTA
PORTION OF SAN LORENZO:
San Enrique, Suclaran, Cabungahan, Gaban, MChavez, Aguilar, Tamborong and Portion of Cabano
Once the maintenance activity is done, power supply will be restored immediately. All our MEMBER-CONSUMER-OWNERS (MCOS) are advised to take precautionary measures and necessary preparations.