11/05/2026
at Solemare Parksuites Bradco Avenue Parañaque City
Landmark: DFA Aseana
salamat po sa tiwala sa walk in client nag pa troubleshoot sa electrical system after initial checking ng admint department pinahanap sila ng outsource electrical contractor para mag check sa unit nila at yun marami akong nakitang problima.
4set ❎count home run in 1 mcb 1pole
2 sets❎
yung 9 branches sa busbar naging 15 sets.⚠️
from 60amp mccb galing sa metro main feeder line 14mm²
pag baba sa panel ng unit naging 80 amp 1 pole⚠️❎
ito mas masaklap from 80amper 1pole wiring color green going to branches wire size 5.5mm² only for the 15 home runs.❎❎⚠️⚠️⚠️⚠️⚠️
not doesn't mean nasa loob ka ng buulding total safety sa electrical system naka depindi parin po ito sa electrical contractor povided nyo if inayus nil yung trabahu nila..
keep safe everyone 👌❤️