06/17/23 FIXING CRITICAL ALARM at TIM (TOATAL INFORMATION MANAGEMENT)DIRECTION IS MORE IMFORTANT THAN SPEED.YOU CAN GO F...
22/06/2023

06/17/23 FIXING CRITICAL ALARM at TIM (TOATAL INFORMATION MANAGEMENT)

DIRECTION IS MORE IMFORTANT THAN SPEED.
YOU CAN GO FAST IN THE WRONG DIRECTION.
-REDFOO-


06/16/23 8am-11:37pm Clearing of hallway (done)Clearing of telco room a doneClearing of lvsg a (done)Clearing of battery...
22/06/2023

06/16/23 8am-11:37pm
Clearing of hallway (done)
Clearing of telco room a done
Clearing of lvsg a (done)
Clearing of battery room at TIM (TOTAL INFORMATION MANAGEMENT)

PROGRESS HAS LITTLE TO DO WITH SPEED, BUT MUCH TO DO WITH DIRECTION.
-UNKOWN-


06-05-23  Lvsg ground floorCable pulling-out put for ups 2  (done) at TIM (TOTAL INFORMATION MANAGEMENT)WORKING  HARD AN...
08/06/2023

06-05-23
Lvsg ground floor
Cable pulling
-out put for ups 2 (done) at TIM (TOTAL INFORMATION MANAGEMENT)

WORKING HARD AND WORKING SMART, CAN SOMETIMES BE TWO DIFFERENT THINGS.
-BYRON DORGAN-


05 25 23Installation of cable ladder lvsg groundFabrication of support (done)Fabrication of cable ladder 700cm (done)Wra...
26/05/2023

05 25 23
Installation of cable ladder lvsg ground
Fabrication of support (done)
Fabrication of cable ladder 700cm (done)
Wrapping of pipe with polyethylene tape crack room at TIM (TOTAL INFORMATION MANAGEMENT) CAVITE

FOCUS ON BEING PRODUCTIVE INSTEAD OF BUSY.
-TIM FERRISS-


05 22 23Installation of cable ladder and support ups to wab (done)Painting of pipe crack room A doneInsulation of piping...
23/05/2023

05 22 23
Installation of cable ladder and support ups to wab (done)
Painting of pipe crack room A done
Insulation of piping crack room A done
Wrapping of polyethylene tape for piping (done)
Fabrication and installation of stand crack room b (done)
For supply return for piping stand at TIM (TOTAL INFORMATION MANAGEMENT) CAVITE

THERE IS NO SUBSTITUTE FOR HARD WORK.
-THOMAS EDISON-


05 13 23 PREVENTIVE MAINTENAN, Dc 3  (done)  at TIM(TOTAL INFORMATION MANAGEMENT) MAIN BUILDING CAVITEYOU CAN'T GO BACK ...
20/05/2023

05 13 23 PREVENTIVE MAINTENAN,
Dc 3 (done) at TIM(TOTAL INFORMATION MANAGEMENT) MAIN BUILDING CAVITE

YOU CAN'T GO BACK AND CHANGE THE BEGINNING BUT YOU CAN START WHERE YOU ARE AND CHANGE THE ENDING.
-C.S. LEWIS


05 12 23 PREVENTIVE MAINTENANCE  * ANNEX A AND B (DONE)*EE ROOM A AND B (DONE)*TELCO ROOM (DONE) at TIM (TOTAL INFORMATI...
13/05/2023

05 12 23 PREVENTIVE MAINTENANCE
* ANNEX A AND B (DONE)
*EE ROOM A AND B (DONE)
*TELCO ROOM (DONE) at TIM (TOTAL INFORMATION MANAGEMENT) MAIN BUILDING CAVITE

HARD WORK DOES NOT NECESSARILY GURANTEE SUCCESS,
BUT NO SUCCESS IS POSSIBLE WITHOUT HARD WORK.
-DR. T.P. CHIA-


05 11 23 REPAIR  OF PIPING LVSG A done*Installation of cable tray elbow *DOWN TO WAB*DOWN TO ATS*DOWN TO 2UNITS OF UPS*T...
13/05/2023

05 11 23 REPAIR OF PIPING LVSG A done
*Installation of cable tray elbow
*DOWN TO WAB
*DOWN TO ATS
*DOWN TO 2UNITS OF UPS
*TESTING OF PRESSURE LVSG A
*LVSG B PIPING OF 1 UNIT (done)
* INSTALLATION OF CABLE LADDER
*FINISHING BATTERY ROOM TO LVSG
*HAULING OF WALL LVSG A TO BATTERY ROOM (DONE) at TIM (TOTAL INFORMATION MANAGEMENT)

THE ROAD TO SUCCESS COMES THROUGH HARDWORK, DETERMINATION. AND SACRIFICE.
-DOLZINSKI-


05 11 23 PREVENTIVE MAINTINANCE *DC 1(DONE)CLEANING OF OUTDOORCLEANING OF INDOORREADING PARAMETERSCLEANING OF DRAIN PAN*...
13/05/2023

05 11 23 PREVENTIVE MAINTINANCE
*DC 1(DONE)
CLEANING OF OUTDOOR
CLEANING OF INDOOR
READING PARAMETERS
CLEANING OF DRAIN PAN

*DCX (DONE)
INDOOR/OUTDOOR CLEANING
READING PARAMETERS
*DC2 DONE
INDOOR/OUTDOOR CLEANING
READING PARAMETERS at TIM (TOTAL INFORMATION MANAGEMENT) Cavite main building

SUCCESSFUL PEOPLE ARE NOT GIFTED;
THEY JUST WORK HARD, THEN SUCCEED ON PURPOSE.
-G.K. NELSON-


05 02 23 INSTALLATION OF TOP  BUTTOM FOR DUCTING FRAME,*Piping for LVSG a repaired unit ,*Hauling of insulations  room B...
06/05/2023

05 02 23 INSTALLATION OF TOP BUTTOM FOR DUCTING FRAME,
*Piping for LVSG a repaired unit ,
*Hauling of insulations room B.
*Installation of ball valve preparation for pressure testing
*Repair and finalization of PAHU crack room A
*Threading GI pipe for LVSG A
*Painting of ducting frame for 12/12 (BLACK PAINT)., at TIM (TOTAL INFORMATION MANANGEMENT )CAVITE.

LIVE AS IF YOU WERE TO DIE TOMORROW.
LEARN AS IF YOU WERE TO LIVE FOREVER.
-MAHATMA GANDHI-


04 27 2023GEN. CLEANING OF ACU AND FCU.CLEANING AND CHECK  UP ALL POWER AND DATA at ILOILO GLOBE PACU GPM .A DREAM DOES ...
04/05/2023

04 27 2023
GEN. CLEANING OF ACU AND FCU.
CLEANING AND CHECK UP ALL POWER AND DATA at ILOILO GLOBE PACU GPM .

A DREAM DOES NOT BECOME REALITY THROUGH MAGIC;
IT TAKES SWEAT, DETERMINATION AND HARD WORK.
-COLIN POWELL-


04-25-23 PREVENTIVE MAINTENANCE atCITADEL General trias CaviteSUCCESS IS NOT FINAL;FAILURE IS NOT FATAL;IT IS THE COURAG...
29/04/2023

04-25-23 PREVENTIVE MAINTENANCE at
CITADEL General trias Cavite

SUCCESS IS NOT FINAL;
FAILURE IS NOT FATAL;
IT IS THE COURAGE TO CONTINUE THAT COUNTS.
-WINSTON S. CHURCHILL-


Address

Quezon City
1109

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Telephone

+639503908344

Website

Alerts

Be the first to know and let us send you an email when JRAB-Tech Refrigeration and Airconditioning Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JRAB-Tech Refrigeration and Airconditioning Services:

Share