Go Green International

Go Green International GO GREEN is a supplier of Green Paints SERPO and Cork which is the best in Thermal and Acoustic insulation material.

Exclusive Agent and Suppliers UPHO MOEDING SIPOREX , and managed by expertise with more than 25 years experience in Green Building Products to promote the concept of Green Building. AERATED AUTOCLAVED CONCRETE (AAC) has been identified as a primary emerging "green" product GO GREEN will introduce it to both the government and private sectors. Also, Go Green supplies and fixe

s Cladding Decorational System that will help achieving in saving of HVAC energy through Alphaton and Longoton cladding system manufactured in Germany. GO GREEN is a Supplier and Builder of green technology manufactured by LCC SIPOREX KSA, for Qatar and UAE marketplaces. As a value added dealer, GO GREEN will provide support services to include architectural and structural design review, installation, training, estimating, project management support and quality control to projects ' clients. GO GREEN is a member at USGBC in USA, and QSAS – GRD, and QGBC in Qatar.

فيلتك تستاهل لوك جديد. فومي يجدّدها كاملة، بسرعة وبدون فوضى.فومي حجر مرن، يركب فوق الجدران الموجودة على طول. برّا وداخل....
04/09/2026

فيلتك تستاهل لوك جديد. فومي يجدّدها كاملة، بسرعة وبدون فوضى.

فومي حجر مرن، يركب فوق الجدران الموجودة على طول. برّا وداخل. واجهات، أعمدة، مجالس، كل شي.

خفيف، مقاوم للحرارة، مقاوم للماي، ويتحمّل جو قطر.

فيلتك بعد فومي؟ الجيران بيسألونك من سوّاها.

فومي هولدنغ قطر. تفاصيل تصنع الفرق.

راسلنا خاص للعينات والأسعار.

Your villa deserves an upgrade. Phomi transforms it completely, fast and with no mess.

Phomi is flexible stone. It installs directly over your existing walls. Outdoors and indoors. Facades, columns, majlis, everything.

Lightweight, heat resistant, water resistant, and built for Qatar's climate.

Your villa after Phomi? The neighbours will ask who did it.

Phomi Holding Qatar. Details define the space.

DM us for samples and pricing.

+974 5000 3294 | www.phomiofficial.com

#فومي #واجهات #مجالس #الدوحة #قطر

🚀 First Floor Printing Has Begun. Mark the days.Today we start printing the first floor. Total built-up area: almost 8,5...
28/08/2026

🚀 First Floor Printing Has Begun. Mark the days.
Today we start printing the first floor. Total built-up area: almost 8,500 m². Target: 33 working days to complete.
We are not just printing walls. We are racing the fastest and strongest building machines in the world, on the same clock, on a live project site in Qatar.
Layer by layer, our MaxiPrinter is proving that robotic construction is not the future. It is happening now, under the Qatari sun, with speed, precision, and strength that conventional methods cannot match.
Count with us. Day 1 of 33 starts today.
Transforming building construction into robotics.
Go Green International W.L.L. | Msheireb Downtown Doha | ISO 9001 | 14001 | 45001
| www.gogreenintl.com


🚀 بدأنا اليوم طباعة الطابق الأول. سجلوا الأيام معنا.
المساحة الإجمالية للبناء تقارب 8,500 متر مربع، والهدف إنجازها خلال 33 يوم عمل فقط.
نحن لا نطبع جدراناً فحسب، بل نتحدى أسرع وأقوى آلات البناء في العالم، على نفس المدة الزمنية، وفي موقع مشروع حقيقي في قطر.
طبقة بعد طبقة، تثبت طابعتنا الروبوتية أن البناء الروبوتي ليس مستقبلاً بعيداً، بل واقع يحدث الآن تحت شمس قطر، بسرعة ودقة وقوة لا تضاهيها الطرق التقليدية.
عدّوا الأيام معنا. اليوم الأول من 33 يبدأ الآن.
نحوّل البناء إلى روبوتات.
Go Green International W.L.L. | مشيرب قلب الدوحة | www.gogreenintl.com
#قطر

16/08/2026

Proud moment for all the team to welcome new generations

الطباعة ثلاثية الأبعاد بالخرسانة  نبني بطريقة مختلفة وبسرعة أكبر..جيل جديد من البناء الخرساني يجمع بين الحرية المعمارية،...
14/08/2026

الطباعة ثلاثية الأبعاد بالخرسانة
نبني بطريقة مختلفة وبسرعة أكبر..

جيل جديد من البناء الخرساني يجمع بين الحرية المعمارية، سرعة التنفيذ، المتانة وكفاءة الغلاف الخارجي للمبنى.

نظام 3DCP يساهم في الاستغناء عن:
• الشدات والقوالب التقليدية
• اللياسة التقليدية للجدران
• طبقات العزل المائي التقليدية في المواقع التي يحقق فيها نظام الطباعة المصمم متطلبات الحماية المطلوبة
• التكسير والتخريم وعمل المجاري لتمديدات الـ MEP، حيث يمكن تنسيق الخدمات والمواسير داخل الفراغات المصممة في الجدار المطبوع

أهم المزايا:
• سرعة عالية في التنفيذ وتقليل الأعمال في الموقع
• عمر تصميمي مستهدف يصل إلى 100 سنة وفقاً للتصميم الإنشائي وظروف التعرض ومتطلبات المتانة
• نظام خرساني مسلح يتم تصميمه طبقاً للمتطلبات الإنشائية
• خرسانة طباعة عالية المقاومة تصل إلى 50 ميجا باسكال عند اعتمادها والتحقق منه

A new generation of concrete construction combining architectural freedom, speed, durability and high-performance building envelopes.

3DCP ELIMINATES:

• Conventional shuttering / formwork
• Conventional wall plastering
• Conventional waterproofing layers where the designed 3DCP system provides the required protection
• Cutting and chasing for MEP services — services and conduits can be coordinated within the hollow printed wall system

KEY ADVANTAGES:

• Fast construction and reduced site activities
• Design life target of up to 100 years, subject to structural design, exposure conditions and durability specification
• Reinforced concrete system engineered for structural requirements
• High-strength printable concrete — up to 50 MPa where spec

الطباعة ثلاثية الأبعاد بالخرسانة  نبني بطريقة مختلفة وبسرعة أكبر..جيل جديد من البناء الخرساني يجمع بين الحرية المعمارية،...
14/08/2026

الطباعة ثلاثية الأبعاد بالخرسانة
نبني بطريقة مختلفة وبسرعة أكبر..

جيل جديد من البناء الخرساني يجمع بين الحرية المعمارية، سرعة التنفيذ، المتانة وكفاءة الغلاف الخارجي للمبنى.

نظام 3DCP يساهم في الاستغناء عن:
• الشدات والقوالب التقليدية
• اللياسة التقليدية للجدران
• طبقات العزل المائي التقليدية في المواقع التي يحقق فيها نظام الطباعة المصمم متطلبات الحماية المطلوبة
• التكسير والتخريم وعمل المجاري لتمديدات الـ MEP، حيث يمكن تنسيق الخدمات والمواسير داخل الفراغات المصممة في الجدار المطبوع

أهم المزايا:
• سرعة عالية في التنفيذ وتقليل الأعمال في الموقع
• عمر تصميمي مستهدف يصل إلى 100 سنة وفقاً للتصميم الإنشائي وظروف التعرض ومتطلبات المتانة
• نظام خرساني مسلح يتم تصميمه طبقاً للمتطلبات الإنشائية
• خرسانة طباعة عالية المقاومة تصل إلى 50 ميجا باسكال عند اعتمادها والتحقق منه

A new generation of concrete construction combining architectural freedom, speed, durability and high-performance building envelopes.

3DCP ELIMINATES:

• Conventional shuttering / formwork
• Conventional wall plastering
• Conventional waterproofing layers where the designed 3DCP system provides the required protection
• Cutting and chasing for MEP services — services and conduits can be coordinated within the hollow printed wall system

KEY ADVANTAGES:

• Fast construction and reduced site activities
• Design life target of up to 100 years, subject to structural design, exposure conditions and durability specification
• Reinforced concrete system engineered for structural requirements
• High-strength printable concrete — up to 50 MPa where specified and verified by testing
• Hollow multi-layer printed wall configuration for improved thermal performance and MEP integration
• Finished printed texture can remain exposed or be painted later
• Reduced material waste and cleaner construction process
• Freedom to create curved and complex architectural forms without conventional formwork
From digital model directly to construction.
ConstructionTechnology FutureOfConstruction Concrete Architecture Engineering SustainableConstruction Qatar Doha ConstructionQatar

Proud moment for Go Green International (GGI) 🇶🇦Ashghal has announced over 80% completion of the 14 New Schools Project ...
31/07/2026

Proud moment for Go Green International (GGI) 🇶🇦

Ashghal has announced over 80% completion of the 14 New Schools Project under the second package of the Qatar Schools Development Programme, a QAR 4.5 billion investment serving more than 10,000 students across 10 areas of Qatar.

GGI is honored to be part of this national achievement:

✅ 8 schools completed using AAC Wall Panel System
🔄 2 schools ongoing with AAC Wall Panels
🖨️ 1 school under construction printing using also latest technology that will be announced later.

A special thank you to the entire and team for their continuous support, professionalism, and for giving us the opportunity to be part of this challenge. Delivering advanced building systems at this scale is only possible with a main contractor that believes in innovation.

With new construction methods like 3D printing and modular technologies, and around 70% of materials locally sourced, this programme reflects Qatar's commitment to sustainable and innovative construction, in support of Qatar National Vision 2030.

Thank you to Ashghal, UCC, and all project partners for the trust.



لحظة فخر لشركة غو غرين إنترناشيونال (GGI) 🇶🇦

أعلنت هيئة الأشغال العامة (أشغال) عن إنجاز أكثر من 80% من مشروع إنشاء 14 مدرسة جديدة ضمن الحزمة الثانية من برنامج تطوير مدارس قطر، باستثمار يبلغ نحو 4.5 مليار ريال قطري، ليخدم أكثر من 10,000 طالب في 10 مناطق مختلفة من دولة قطر.

وتتشرف GGI بأن تكون جزءاً من هذا الإنجاز الوطني:

✅ إنجاز 8 مدارس باستخدام نظام ألواح الجدران AAC
🔄 مدرستان قيد التنفيذ بنظام ألواح AAC
🖨️ مدرسة واحدة قيد الإنشاء باستخدام أحدث التقنيات التي سيتم الإعلان عنها لاحقاً

شكر خاص لفريق UCC و اشغال بأكمله على دعمهم المتواصل واحترافيتهم العالية، وعلى منحنا الفرصة لنكون جزءاً من هذا التحدي. فتنفيذ أنظمة البناء المتقدمة بهذا الحجم لا يتحقق إلا مع مقاول رئيسي يؤمن بالابتكار.

ومن خلال أساليب البناء الحديثة مثل الطباعة ثلاثية الأبعاد وتقنيات البناء المعياري، ومع توفير نحو 70% من المواد من مصادر محلية، يعكس هذا البرنامج التزام دولة قطر بالبناء المستدام والمبتكر، دعماً لرؤية قطر الوطنية 2030.

كل الشكر لأشغال وUCC وجميع شركاء المشروع على هذه الثقة.

UCC أشغال Ashghal قطر Qatar AAC 3DCP 3DPrinting الطباعة_ثلاثية_ال

فقد العالم رجل من الطراز الرفيع لم تفقده قطر فقط ولم يفقده العالم العربي فقط بل فقده العالم أجمع قمة في الشجاعة و ذهب حي...
14/07/2026

فقد العالم رجل من الطراز الرفيع
لم تفقده قطر فقط
ولم يفقده العالم العربي فقط
بل فقده العالم أجمع
قمة في الشجاعة و ذهب حيث لم يجرؤ الآخرون
قمة في الامانة والتواضع و الحب و العطف
الحزن لف العالم
وأثره في العالم كبير
رحم الله ابو مشعل
الأمير الوالد حمد بن خليفة آل ثاني
عزأنا للأمير المفدى تميم بن حمد آل ثاني
و لأسرة آل الثاني الكرام و عموم اهالي قطر الكرام.

انا لله و انا اليه راجعون رحم الله فقيـد الوطن وعظم الله أجرنا  و أجركم يا أهل قطــر اللهم اغفر له وارحمه واعفُ عنه وأكر...
12/07/2026

انا لله و انا اليه راجعون

رحم الله فقيـد الوطن وعظم الله أجرنا و أجركم يا أهل قطــر

اللهم اغفر له وارحمه واعفُ عنه وأكرم نزله ووسع مدخله ونقه من الخطايا كما ينقى الثوب الأبيض من الدنس .. وأبدله بداراً خيراً من داره وأدخله الجنة .. آمين

08/07/2026

At Go Green International, we compete with no one but ourselves. And every day is a race day on our 3D printing projects in Qatar, and we win.

In collaboration with:

ltd


the results speak for themselves.

What smart printing delivers:

✅️ Plug and play mobility, record time from arrival to printing: less than 30 minutes
✅️ Premixed, quality-controlled material, consistent every print
✅️ Ultra high end software with intelligent print sequencing
✅️ 175 print positions completed in less than 60 working days
✅️ Smart machines with built-in surveying and self-positioning
✅️ No special foundations, no fixed installations, no downtime between positions
Moving a printer should take minutes.

Every hour a machine is not printing is an hour the building is not rising.

🎯Beat the Hercules and play it smart.

في غو غرين إنترناشونال، لا ننافس أحداً سوى أنفسنا. وفي كل يوم في مشاريع الطباعة ثلاثية الأبعاد في قطر، نحقق الفوز.
بالتعاون مع Construction 3D ، وهولسيم مع قطر ريدي ميكس، النتائج تتحدث عن نفسها.
ما الذي تقدمه الطباعة الذكية:
✅️ تشغيل فوري، رقم قياسي من الوصول إلى بدء الطباعة: أقل من 30 دقيقة
✅️ مواد جاهزة الخلط بجودة مضمونة وثابتة في كل طباعة
✅️ برمجيات فائقة التطور مع تسلسل طباعة ذكي
✅️ 175 موقع طباعة أُنجزت في أقل من 60 يوم عمل
✅️ آلات ذكية مزودة بنظام مسح ومعايرة مدمج
✅️ لا قواعد خاصة، لا تركيبات ثابتة، لا توقف بين المواقع
نقل الطابعة يجب أن يستغرق دقائق، . كل ساعة لا تطبع فيها الآلة هي ساعة لا يرتفع فيها المبنى.

GoGreenInternational Construction3D Holcim QatarReadyMix MaxiPrinter Qatar Doha DigitalConstruction SmartConstruction

Address

Musheireb Downtown
Mushayrib

Alerts

Be the first to know and let us send you an email when Go Green International posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Go Green International:

Shortcuts

Share