15/04/2023
Electrical fixer maker day is over. We finally got this now restored machine back to its owner. The main job was to replace the brew tank, but the machine is manufactured 2005, so all electrical connectors and cables needed to be checked. We went through all cables, connectors, fitted all new polyamide insulators, replaced all screw terminals and in some cases cables for new. The old terminals, cables and connectors where falling to pieces. It’s hard to grasp the amount of work that goes in to all the small details on a job like this, we are happy to see this machine back in action.