WHY WE NEEDS TO POUR WATER AFTER COMPACTION...‎Pouring water after soil compaction during construction is a common pract...
09/02/2025

WHY WE NEEDS TO POUR WATER AFTER COMPACTION...

‎Pouring water after soil compaction during construction is a common practice known as "moisture conditioning" or "watering." Here are some reasons why it's necessary:


‎REASONS FOR POURING WATER

‎1. SETTLEMENT AND CONSOLIDATION: Water helps to settle and consolidate the soil particles, ensuring a more stable and even surface.

‎2. REDUCES SOIL FRICTION: Water reduces the friction between soil particles, making it easier for them to settle and compact.

‎3. PREVENTS SHRINKAGE: Water helps to prevent soil shrinkage, which can lead to cracks and uneven surfaces.

‎4. IMPROVES COMPACTION: Water helps to improve the compaction process by allowing the soil particles to move more freely and settle into a more stable configuration.

‎5. REDUCES SOIL DENSITY VARIATIONS: Water helps to reduce variations in soil density, ensuring a more uniform and stable surface.


‎BENEFIT OF POURING WATER
‎1. IMPROVED SOIL STABILITY: Moisture conditioning helps to improve soil stability, reducing the risk of settlement and structural damage.

‎2. REDUCES MAINTENANCE: A stable and even surface reduces the need for maintenance and repairs.

‎3. ENHANCED CONSTRUCTION QUALITY: Moisture conditioning is an essential step in ensuring the quality of construction, particularly for critical infrastructure projects.


‎REMEMBER TO...
‎. AVOID OVER-WATERING: Excessive water can lead to soil erosion, instability, and other issues.
0772075757

Celebrating my 11th year on Facebook. Thank you for your continuing support. I could never have made it without you. 🙏🤗🎉
27/01/2025

Celebrating my 11th year on Facebook. Thank you for your continuing support. I could never have made it without you. 🙏🤗🎉

27/01/2025

BUILDING TIPS THIS WEEK

Foundations are a crucial step in a construction project. It's also a step that's hard to catch in case of mistakes.

Here are, among other things, important points to check at this stage:

✅ Ensure that the project has a building permit. Place the construction sign at the front of the site and keep a paper copy of the permit file, on the construction site.

✅ Ensure that the foundations and the entire project are executed according to project specific structural plans, not just a copy and paste structural plan. Structural plans must be available on site.

✅ Ensure that the fence follows well the boundaries mentioned on the topographic extract of the land. Having a surveyor intervene for verification

✅ Check that the building's implantation is in accordance with the plans before starting the excavation of the foundation.

✅ Ensure that the chain level is well above the street, with a minimum of 30 cm above the street to prevent rainwater from flowing into the house.

✅ Check that the axes of the building are planted orthagonally.

✅ Carry out the groundwork of the building during the foundation (i.e. laying the copper, which will allow to insulate the house from potential power leaks).

✅ Check that the thicknesses of the concrete irons used match the structural plans and comply with the plan.

✅ Ensure that foundation walls are cracked and sealed to avoid capillary rises.

✅ Before making the walling, if the filling around the foundations has been made in soil, make sure it has been compacted with a jumping lady or a compactor, in layers of maximum 50 cm.

Have a great week everyone!


0772075757

Proposed storeyed commercial/hostel building, call us on 0772075757 for more designs of your choice
14/11/2024

Proposed storeyed commercial/hostel building, call us on 0772075757 for more designs of your choice

Proposed guest house in Bushenyi, You too can build with us find us on 0772075757/0705812044
17/08/2024

Proposed guest house in Bushenyi, You too can build with us find us on 0772075757/0705812044

You too can build with us
02/06/2024

You too can build with us

27/04/2024
Proposed cottages,design with us 0772075757
01/03/2024

Proposed cottages,design with us 0772075757

4bedrooms ,lounge,dining ,kitchen etc Call 0772075757 and build with us
26/02/2024

4bedrooms ,lounge,dining ,kitchen etc Call 0772075757 and build with us

Three bedrooms ,lounge,dining,open kitchen,carport etc on a 50x100 plot
09/01/2024

Three bedrooms ,lounge,dining,open kitchen,carport etc on a 50x100 plot

31/12/2023

Happy New year to all our customers

Hotel building, you too can build with us contact us on 0772075757
23/12/2023

Hotel building, you too can build with us contact us on 0772075757

Address

ISHAKA BUSHENYI
Bushenyi
256

Telephone

+256772075757

Website

Alerts

Be the first to know and let us send you an email when JOSH CONSULT posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share