30/06/2019
http://www.noorlogisticsug.com/achwa-dam/
Noorlogistics Played a big role Being a distribution line, only 12MW of power will be evacuated from the Aswa dam as opposed to the 42MW, meaning the dam will be operating below capacity. Construction of the 33kv line is expected to be completed by October, in time for the dam. Power evacuated from....