06/30/2016
We began installing sills in the swale along Management Trail in Pennypack Trust. This will allow for sediment to be held back behind the sills, building up the bed of the swale and decreasing bank erosion. We also began a check dam of stone along a pre-constructed stone wall. It is unknown how long the wall has been there in the swale.