Moving offices this year? Here is the short version of the network checklist we walk customers through.
Internet circuit ordered, with an install date confirmed in writing.
A backup path if you cannot afford downtime, even a wireless failover.
Network closet ready: power, cooling, a rack, and the patch panel terminated and labeled.
Cabling pulled, tested, and labeled to every desk.
Switches, firewall, and access points configured and ready to drop in.
Phone numbers ported, confirmed ahead of time.
A real cutover plan: what turns on when, and who to call if something is down.