10/08/2026
Did you see our latest news?
XTPT | American Antimony 🇺🇸
⛏️ Arrance Selected as Initial Resource & Production Target!
After months of geological mapping, drilling, engineering, metallurgy, and permitting evaluations, American Antimony has selected the Arrance Mine as the starting point for its initial development plans at Bernice Canyon, Nevada.
📌 Key Highlights:
⚒️ Arrance Selected — Initial focus for resource drilling, bulk sampling, and small-mine permitting.
⚒️ Phase I Drilling — 285 feet averaging 1.46% Sb, with assays up to 5.59% Sb and mineralization extending to approximately 500 feet of vertical depth.
⚒️ High-Grade Sampling — Arrance material returned up to 31.09% Sb in channel sampling results.
⚒️ 0.67-Mile Development Corridor — Initial focus extends from Arrance toward the Antimony King Mine along the mineralized d**e trend.
⚒️ Metallurgical Results at Antimony King — Approximately 63% Sb concentrate at 97% recovery in previous flotation testing.
We're working to establish the foundation for a district-scale domestic antimony supply.
🔗 Read the latest news: https://www.newsfilecorp.com/release/317830/American-Antimony-Advances-Toward-Initial-Resource-and-Production-at-Bernice-Canyon