04/24/2025
Job start to finish snapshots! Started with an old 10x42 mobile office building. Due to the condition of the frame and neck we were unable to haul it whole. So it got demolished down to the metal frame on the bottom. All the wood and debris was burnt. All the metals and frame were scrapped out. Cleaned up the areas on both lots that the building was on. Now the owner can utilize his properties and we were able to build new relationships with the owner and other neighbors from the job.