BGN Trenchless Consulting

BGN Trenchless Consulting BGN Trenchless Consulting is a team of highly experienced, trenchless installation consultants.

🙌
11/17/2025

🙌

Last week our team hosted Total Boring Solutions at the Barbco training site. This specifically tailored, complete train...
11/11/2025

Last week our team hosted Total Boring Solutions at the Barbco training site. This specifically tailored, complete training included safety, setup, operation, troubleshooting, and more!
If you’re interested in getting your crew freshened up, or looking for specific skills training, give our team a shout!

10/17/2025

WIN with BGN Trenchless Consulting LLC! Contact us for complete bore training, on-site assistance, and installation consultation!

Big shoutout to Reinhard Boring Technologies on the successful, in-house, completion of this pilot tube shot! Many thank...
09/26/2025

Big shoutout to Reinhard Boring Technologies on the successful, in-house, completion of this pilot tube shot! Many thanks for your trust in the BGN team!
Keep turning right !

08/27/2025

That’s what we like seeing! Turning right, and bringing it out!

Big shoutout and congratulations to J.H. Nicklas Inc on the completion of this high tolerance 18” guided auger bore! The...
07/17/2025

Big shoutout and congratulations to J.H. Nicklas Inc on the completion of this high tolerance 18” guided auger bore! The bore included a water main crossing with 3” of clearance, and an exit window of zero tolerance on line and elevation!

We take on your   service needs! Our full fabrication/service shop is here for any of your maintenance, repair, and moto...
04/25/2025

We take on your service needs!
Our full fabrication/service shop is here for any of your maintenance, repair, and motor work.. just like this repair/rebuild project on a Barbco BD60 with a wore out C7.
Our team is available 24/7, just give us a call.

04/16/2025
A big shout out to the Trenchless Technology Center of Louisiana Tech University ! We can’t wait for the 8th Auger Borin...
03/01/2025

A big shout out to the Trenchless Technology Center of Louisiana Tech University ! We can’t wait for the 8th Auger Boring School!

02/11/2025

Check out the 60” Barbco TBM-RC!
Featuring a 150hp variable frequency drive electric motor, rear-replaceable gauge cutters, and an adaptive bolt-in driveline allowing the contractor to switch from 54” to 84” diameter sizes.
Additionally, the TBM-RC is specifically designed for use with any traditional Auger Boring Machine, old or new!
Give us a call to talk about this cost-effective, simple yet strong, TBM system!

Address

5938 Perry Hills Drive SW
Canton, OH
44707

Telephone

+13304131879

Website

Alerts

Be the first to know and let us send you an email when BGN Trenchless Consulting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share