Waldo Mining District

Directions Website Contact the business

Waldo Mining District To Preserve, Protect, and Promote Mining

I just want to say thank you to all those people who take the time to engage with this page.  I know for the local commu...
10/13/2026

I just want to say thank you to all those people who take the time to engage with this page. I know for the local community, the topic of Homeland Nickel and proposed exploration is a difficult topic to discuss without emotions taking over. For every negative comment I receive covering this topic, I gain a dozen positive comments, both publically and privately, thanking me for taking the time to break down complex ideas, global movements and regulation affecting all of us. So keep the comments coming, and enjoy this picture of the Akers lode mine here in the IV. (This is an active claim, not open for mineral exploration).

Evening views in Waldo Mining District- overlooking the Illinois Valley and the airport.
10/11/2026

Evening views in Waldo Mining District- overlooking the Illinois Valley and the airport.

Building Domestic Nickel Supply ChainsWestwin Elements’ planned commercial-scale nickel refinery in Natchez, Mississippi...
10/10/2026

Building Domestic Nickel Supply Chains

Westwin Elements’ planned commercial-scale nickel refinery in Natchez, Mississippi, marks a significant step toward establishing a domestic processing outlet for nickel from projects such as Homeland Nickel’s Red Flat property in southwestern Oregon.

Westwin announced Monday that it has secured a long-term lease in Natchez and plans to invest $502 million over the next five years to establish a Class 1 nickel refinery. After evaluating potential locations across the country, the company selected a site with infrastructure suited to commercial production, including port access to the Mississippi River and connections to transportation networks.

The proposed facility would use carbonyl refining technology and is expected to create three million a year in tax revenue, and 134 full-time jobs with an average annual salary of $84,000. Its finished nickel products would serve national defense, aerospace, advanced manufacturing, specialty alloys, energy, and other industrial markets.

A Potential Oregon Supply Connection

On September 28, Canadian exploration company Homeland Nickel announced a binding offtake agreement with Westwin for its Red Flat nickel project in Curry County, Oregon. The agreement represents Westwin’s first domestic supply deal and anticipates the delivery of 20,000 tonnes of nickel concentrate annually from Homeland.

The agreement connects Red Flat’s exploration and development efforts with Westwin’s planned U.S. refining capacity. However, the project must still undergo further technical, economic, and environmental evaluation before its potential as a commercial source of nickel can be established.

Under the announced arrangement, Homeland will complete an updated Mineral Resource Estimate (MRE) and a Preliminary Economic Assessment (PEA). If Westwin is satisfied with the PEA results, it will fully fund a bankable feasibility study for Red Flat. The proposed scope includes permitting work, drilling, environmental assessments, and more detailed economic analysis.

What the Feasibility Study Would Examine

The central question is bankability: whether the project’s technical and economic foundations are strong enough to attract financing.
A bankable feasibility study would examine the proposed operation in detail, bringing together its resource estimates, production plans, processing requirements, infrastructure needs, costs, market prospects, and risks.

Key areas of evaluation would include:

Technical feasibility: Additional drilling and resource evaluation, along with analysis of mining methods, processing performance, and infrastructure requirements.

Market conditions: Demand for the proposed products, anticipated pricing, and the project’s relationship with its intended refinery customer.

Financial performance: Estimated construction and operating costs, projected revenue, financing requirements, and sensitivity to changes in prices or costs.

Environmental and regulatory requirements: Environmental assessments, applicable legal requirements, and the permits and approvals needed to proceed.

The study would provide a more detailed basis for deciding whether to advance the project. It would not, by itself, establish that the mine is approved, financed, or ready for construction.

The Red Flat Property

The Red Flat nickel property lies approximately 15 kilometers southeast of Gold Beach, Oregon, and comprises 84 lode mining claims covering approximately 2,015 acres. Access is available from Highway 101 via Hunter Creek Road and Forest Service Road 3680, with local roads reaching much of the property.

Historical estimates report 18.8 million tons of material grading 0.84% nickel, including 10.4 million tons classified as measured and indicated resources grading 0.88% nickel. Garnierite is present on the property, and the historical figures indicate a slightly higher nickel grade in the rock component than in the soil. The reported measured rock resource totals more than 2.3 million tons grading 1.05% nickel, using a resource cutoff grade of 0.7% nickel.
These historical figures provide context for the project’s exploration potential. Homeland’s updated resource estimate and subsequent economic studies will be important in establishing how much material could support a commercial operation and on what terms.

What Comes Next

The next milestones are Homeland’s updated resource estimate and preliminary economic assessment, followed—if Westwin accepts the results—by the funded bankable feasibility study.
For Red Flat, the offtake agreement establishes a potential connection to a domestic refinery and a conditional path toward more advanced project evaluation. Whether that connection develops into a producing mine will depend on the results of those studies and the project’s ability to meet financing, environmental, and permitting requirements.

Anunnaki Claim pics and info
10/06/2026

Anunnaki Claim pics and info

I just got back from the Anunnaki Claim- One day left to comment. In the pics you can see the red piled rocks- these are...
10/06/2026

I just got back from the Anunnaki Claim- One day left to comment. In the pics you can see the red piled rocks- these are unprocessed tailings. The grey serpentine has been hydraulic washed and blasted by legacy miners. The proposed bulk sampling project will help reclaim this land.
This claim is 75-100 ft above the river level, on a bench that shows mining work from several eras. There are serpentine bedrock fields that have been hydraulicly washed, with deep gouges everywhere. Further east from the river is an unprocessed tailings pile, 40 ft wide, hundreds of ft long, and on average about 15 ft deep. The entire area is criss-crossed with bulldozer trails, and no area appears to be untouched.

The work proposed will process only a small portion of the unprocessed tailings piles to make an assessment of the viability of the claim.

Leave your comments in support here -> https://cara.fs2c.usda.gov/Public/CommentInput?project=420105&utm_source=MarketingCloud&utm_medium=email&fbclid=IwY2xjawUxP9lleHRuA2FlbQIxMQBwZG9mAXNydGMGYXBwX2lkEDIyMjAzOTE3ODgyMDA4OTIAAR6Fv8U_10-cjq7qcFx8hs9vc6M8JwhFEL0el9SzaA0_Yn7h3PgHhiQ9jCUr7A_aem_5_07ZZ85fr96OltymlafzQ

For all of those people who claim to support local miners, I encourage you to leave a comment in support of the Annunaki...
10/04/2026

For all of those people who claim to support local miners, I encourage you to leave a comment in support of the Annunaki Claim project. Details below👇

❗️Miner Action Alert! ❗️

Can you give 3 minutes of time to your local mining community with a public comment?
Public comments are requested in support of a local bulk sampling project, on Forest Service land, here in Waldo Mining District. Comments are open until October 6th.

District Ranger Scott Blower states that “The plan proposes exploratory testing and bulk sampling of alluvial material to determine the presence, grade, and extent of potential mineralization. Activities are limited to short-term evaluation only and do not constitute commercial production. The plan of operations is limited to bulk sampling of approximately 225 cubic yards and would require the use of a small excavator (5 to 8 ton class), one small portable, self-contained trommel and pick-up truck and recreational vehicle trailer for on-site sanitation.

All ground disturbing activities will occur within previously mined and historically disturbed upland tailings areas, outside active stream channels, outside flowing water with no in-stream work proposed. Additionally, activities will be a minimum of 300 feet from the ordinary high-water mark of the Illinois River. Access to the project site will occur on existing roads. All excavated material would be processed on site, and the site would be reclaimed.

The level of NEPA documentation anticipated is a categorical exclusion, and public input is being conducted to ascertain if there are other considerations that the Agency should consider. The project is not discretionary."

When adding comments, please keep commentary constructive such as the examples below.

I support this project for the reasons :

This project is on a historically disturbed brownfield zone that will be restored and reclaimed for the native plant species.

2) This project will not impact any water source and is self contained.

3) The project is necessary to determine and validate the claim values.

4) I support the local small-scale miners.

You will be asked for name and address, email, and given space to write or copy and paste a response. You can even add attachments if you like. If you choose to post anonymously, the comment will be given much less weight as to someone willing to stand by their name.

Comment Link Here-> https://cara.fs2c.usda.gov/Public/CommentInput?project=420105&utm_source=MarketingCloud&utm_medium=email

Thanks everyone!

Sarah Bohmker, Waldo Mining District Secretary

This project will conduct bulk sampling on the Anunnaki Mining Claim, with an expected excavation volume of approximately 222 cubic yards of material. Sampling will be conducted using a mini-excavator to excavate trenches. This project is not discretionary.

The Illinois Valley is facing the real costs behind the green energy revolution. The video below features Steven Balch, ...
09/29/2026

The Illinois Valley is facing the real costs behind the green energy revolution. The video below features Steven Balch, Homeland Nickel's CEO, two weeks ago. He discusses results of tests at Cleopatra and Red Flat, next steps, what the bureaucratic process timeline looks like. Leave your comments or questions below. 👇 Let's discuss 🌲

Could Oregon become a major source of domestic nickel for the Unite...

UPDATED: Images, links, and information on company. Another Critical Minerals mining company is moving into the IV. Imag...
09/24/2026

UPDATED: Images, links, and information on company.

Another Critical Minerals mining company is moving into the IV.

Image one: TOPO GEOLOGY MAP shows Obrien in the upper right hand corner
Image two: TOPO GEOLOGY MAP shows sections 16, 15. Private land in section 16 owned by Gold Coast Mining, roughly 600 acres, and 15 claims in section 15, roughly 300 acres.
Image three: Lidar screengrab of the Turner Albright workings- visible roads and pits circling all the way to the top of the mountain.

Digging through Blue Moon Metals website, they choose sites intentionally. They are after brownfield sites with current infrastructure- sites that have had prior history and work done on them, current access roads, not pristine areas to develop.

Also stated, they are only interested in about 60 acres of the total land and claim purchase, which contains the adit complex of the Turner- Albright.

Christian Kargl-Simard, CEO of Blue Moon states: “Through our screening of Western US critical metals projects, Turner clearly met our spoke requirements with potential scale, timeline and logistics to our Springer hub
(NEVADA LOCATION). There is a clear synergy with the Blue Moon Mine (CALIFORNIA LOCATION) to unlock with nearby rail infrastructure. Turner has seen limited exploration, with the potential for a VMS (link below) camp, along with unquantified cobalt potential. We plan to aggressively explore and develop Turner with establishment of an exploration drive into the deposit including both surface and underground drilling to support metallurgical work as soon as possible.”

From the website: The Company believes that material that is extracted from Turner and the Blue Moon Mine may allow for comingling, or at least, use a similar flotation mill to produce both copper and zinc concentrates with strong precious metals credits. Additional metallurgical and engineering-related studies are required to verify if comingling is possible before it can be integrated into any future engineering report. These studies will be initiated to develop a PEA that is expected to incorporate the Blue Moon Mine and Turner with a new 1,800 tpd mill at the Company’s Springer complex in Nevada. It is expected that the extracted material from both projects will be transported primarily by rail (Figure 1), however, transportation studies are required to demonstrate viability. The Company is targeting to complete these studies by the end of 2027. In the meantime, Blue Moon will initiate permitting for exploration drilling and underground development at Turner, which is expected to take 12 to 18 months. It should be noted that the Company undertook a similar permitting methodology for the Blue Moon Mine in California. For Turner, it will be assumed that there is no processing of extracted material in Oregon.

Blue Moon Metals (BMM) has entered into a purchase agreement of $4.7 Million dollars to acquire Gold Coast Mining LLC's claims and PRIVATE LAND on the California border. Gold Coast Mining showed up in the IV in 2023 according to county records, and is a Washington mining company.

Blue Moon Metals is focused on critical mineral infrastructure, and currently has five projects, 4 in the US and one in Norway. The set of claims in the IV will be it's sixth project in it's portfolio.

The Turner-Albright deposit consists of cobalt, zinc, gold and copper with background minerals including Chalcopyrite, Pyrite, Silver, and Sphalerite. This deposit was originally discovered in 1895, and has been held by a variety of local, regional and world wide interests over the years.

According to the article linked below, Blue Moon plans to initiate permitting for exploration drilling and underground development, which is expected to take 12 to 18 months. Transportation, metallurgical and engineering studies are targeted for completion by the end of 2027 and are intended to inform a PEA expected to include Turner and the Blue Moon Mine, with a new 1,800 tpd mill at the Springer complex in Nevada. Studies are required to verify possible commingling and transportation viability.

Turner’s historical 2010 estimate lists 2.447 million tons Indicated and 2.084 million tons Inferred. Blue Moon says the estimate has not been verified and is not treating it as current.

At this point, the sale is NOT recorded in the county, or the BLM and is only stated to go through in November of this year. We will keep an eye on this company as the sale progresses. -Sarah Bohmker

15 claims x 20.66 acres per claim = 309.9 acres
Image is approximate location to Obrien and the California Border.

https://www.stocktitan.net/sec-filings/BMM/6-k-blue-moon-metals-inc-current-report-foreign-issuer-0d7fe95d6832.html

https://bluemoonmetals.com/blue-moon-acquires-the-turner-copper-gold-vms-deposit-to-further-advance-its-western-u-s-critical-mineral-hub-and-spoke-model/

Explore Blue Moon Metals here -> https://bluemoonmetals.com/

What is VMS? Volcanogenic Massive Sulfide learn more here-> https://investingnews.com/innspired/vms-deposits-long-term-exploration-opportunities/

Good information.  Comment period open until September 21st.
08/29/2026

Good information. Comment period open until September 21st.

08/11/2026

Papers please! There is less than three weeks to file your annual maintenance waiver with the BLM- Due September 1.

Address

Cave Junction, OR
97523

Alerts

Be the first to know and let us send you an email when Waldo Mining District posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Waldo Mining District:

Shortcuts

Share

Category