Capital Railroad Contracting

Call Directions Website

Capital Railroad Contracting Capital Railroad Contracting was established in 1987, focusing on every aspect of railroad maintenance and construction.

Projects like railroad bridges, track construction, switch and turnout installation, crossings, and tie replacement.

10/15/2026

Water is one of the most persistent challenges facing railroad infrastructure.

Poor drainage can soften the subgrade, contaminate ballast, contribute to settlement and shorten the life of track components. Ditches, culverts and properly maintained ballast help move water away from the track structure.

Managing water is an essential part of maintaining reliable track.

10/14/2026
Good communication is a piece of safety equipment every crew carries.Clear instructions, confirmed responsibilities and ...
10/13/2026

Good communication is a piece of safety equipment every crew carries.

Clear instructions, confirmed responsibilities and timely updates help prevent assumptions from becoming hazards. When conditions or plans change, every person affected needs the same information.

A strong crew does not simply talk—it confirms that the message was understood.

Directional Boring & Signal WorkInstalling conduit, cable and utilities around railroad infrastructure requires careful ...
10/08/2026

Directional Boring & Signal Work

Installing conduit, cable and utilities around railroad infrastructure requires careful planning and coordination. Directional boring can create an underground path while limiting surface disruption in locations where open excavation may not be practical.

Capital Railroad supports railroad and industrial projects with site preparation, boring, conduit installation and related signal work.

What is a hi-rail vehicle?A hi-rail vehicle is equipped to travel on both public roads and railroad track. Retractable r...
10/07/2026

What is a hi-rail vehicle?

A hi-rail vehicle is equipped to travel on both public roads and railroad track. Retractable rail wheels allow the vehicle to access the track while its road tires provide propulsion and braking on many configurations.

These vehicles help crews transport people, tools and equipment to locations that may be difficult to reach from the roadway.

New track is more than rail, ties and ballast.Successful rail construction starts with surveying and site preparation, t...
10/06/2026

New track is more than rail, ties and ballast.

Successful rail construction starts with surveying and site preparation, then moves through grading, earthwork, drainage, materials, track laying, surfacing and final alignment. Each stage affects the next. A contractor that understands the whole sequence can spot conflicts early and keep the project moving safely and efficiently.

Contact Capital Railroad when you need one team to coordinate the work from the ground up.

Experienced construction workers know that the right tool can make a difficult day a little easier.If you could choose o...
10/01/2026

Experienced construction workers know that the right tool can make a difficult day a little easier.

If you could choose only one hand tool to keep nearby on every job, what would it be—and why?

We want to hear from the people who know the work best. Add your answer in the comments.

Why is ballast placed beneath railroad track?Ballast does more than support the ties. It helps distribute loads, hold th...
09/29/2026

Why is ballast placed beneath railroad track?

Ballast does more than support the ties. It helps distribute loads, hold the track in position, promote drainage and create a stable working surface. When ballast becomes contaminated, displaced or poorly drained, track performance can suffer.

It may look like ordinary rock, but it performs several critical jobs.

SERVICE SPOTLIGHT: Emergency Railroad RepairSevere weather, derailments, track failures and damaged infrastructure can b...
09/24/2026

SERVICE SPOTLIGHT: Emergency Railroad Repair

Severe weather, derailments, track failures and damaged infrastructure can bring railroad operations to a halt. Capital Railroad Contracting provides experienced crews and specialized equipment to help assess damage, complete critical repairs and restore safe operations as efficiently as possible.

When the unexpected happens, you need a railroad contractor prepared to respond.

Address

8500 E Trade Center Drive
Columbia, MO
65201

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 5pm
Sunday 8am - 5pm

Telephone

+15734743588

Alerts

Be the first to know and let us send you an email when Capital Railroad Contracting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share