Whiteshark Construction. inc.

Whiteshark Construction. inc. We do dirtwork in the summer months. Mostly sewer lines, gray water, septic and footprints. Drywall starts in the fall months.

11/26/2019

Its been a minute. I will post past and current jobs.

05/06/2016
S*x change is coming along nicely.
03/12/2016

S*x change is coming along nicely.

Two timing my s*x change lol. Doin Dirks shower in CBS this weekend. Then back to Aspen double bathroom.
02/19/2016

Two timing my s*x change lol. Doin Dirks shower in CBS this weekend. Then back to Aspen double bathroom.

Calling this one a s*x change.  Turning one bathroom into two.
02/16/2016

Calling this one a s*x change. Turning one bathroom into two.

More of the job before paint
02/02/2016

More of the job before paint

Whiteshark remodel
02/02/2016

Whiteshark remodel

This was the Delta project.. obviously not finished all the way
11/27/2015

This was the Delta project.. obviously not finished all the way

11/15/2015

I will be doing renovations in the Montrose valley during the winter months. I'm trying to only do kitchens and bathrooms. I am willing to consider common area re-wall finish. I will still be operating heavy machinery as well. I am insured and bonded.

Address

Po Box 395
Crested Butte, CO
81224

Alerts

Be the first to know and let us send you an email when Whiteshark Construction. inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share