JB Construction

JB Construction JB Construction does building from new home construction to whole house Remodeling. Decks, tile,Windows and more. No job is to small.

Here's a before and after Pic of the shower.This was 6x12 porcelain tile with a matte black slate look and the floor and...
08/09/2023

Here's a before and after Pic of the shower.
This was 6x12 porcelain tile with a matte black slate look and the floor and accent are a stone look glass mosaic. We used a schluter pan and wall membrane for the walls.

Just finished this deck. It wasn't a new build. We removed the old deck boards and railing and installed composite decki...
06/02/2023

Just finished this deck. It wasn't a new build. We removed the old deck boards and railing and installed composite decking and aluminum railing

A nice little shoe and coat built in
03/30/2023

A nice little shoe and coat built in

45 sf of Harringnone tile . It was a very challenging backsplash .
03/28/2023

45 sf of Harringnone tile . It was a very challenging backsplash .

Subway tile backspalsh we installed today
08/25/2022

Subway tile backspalsh we installed today

We removed the old railing and deckboards and installed new fibercon decking and new metal railings
08/25/2022

We removed the old railing and deckboards and installed new fibercon decking and new metal railings

Before and after picks this made a huge difference .we replaced most of the cedar boards sanded and stained a lot of the...
09/14/2021

Before and after picks this made a huge difference .we replaced most of the cedar boards sanded and stained a lot of the old ones. Stain was super deck from Sherwin Williams. This should last another 40 years.

Sorry a little dirty its new construction. This is a waterproof and scratch and dent resistant laminate floor. Around 96...
09/13/2021

Sorry a little dirty its new construction. This is a waterproof and scratch and dent resistant laminate floor. Around 960 sf. Installed in 2.5 days

Had to go back and modify the shower seat it kept breaking tile so I added hinged legs
06/17/2021

Had to go back and modify the shower seat it kept breaking tile so I added hinged legs

No before photos but this is one I just finished up
06/03/2021

No before photos but this is one I just finished up

Another house I finished siding
05/16/2021

Another house I finished siding

Address

Cuba City, WI
53807

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 5pm
Sunday 9am - 5pm

Telephone

(815) 291-8765

Website

Alerts

Be the first to know and let us send you an email when JB Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share