09/03/2026
This takeoff looked easy.
Straightforward piping. Clear routing. Nothing unusual.
Then one small mention on the plan changed the entire estimate.
**+520 FT of tie-in piping.**
More than **40% of the project’s total pipe length.**
No big callout. No obvious warning. Just one detail that could easily be passed over.
That’s the difference between measuring drawings and actually estimating a project.
**The most expensive quantity is often the one you miss.**