07/28/2026
β
π 60 Days to install erosion, demo/disposal, survey, install storm drain/pond, grade/compact, export, survey curb, install curb, fine grade, install erosion, install base, asphalt, and asphalt striping for a new road and 50 parking spots.
With such a tight timeline in the hottest part of the year we all hammered down to get it done in time for students and buses to access the school.
π A huge thank you to the Bell Excavation team, Horizon Surveying, Jones Curbing, Panagakos Asphalt, Southern Utility, LJ Hammond, Ray Walker Trucking, S.H. Carter, ENS Grading, Bihn Construction and many others that have pushed to make this happen, we make one heck of a team.
βοΈ Call 864-940-4656 for a free estimate from the best on all:
- Land Clearing
- Grading
- Demolition
- Storm Drain
- Onsite Wastewater
- Erosion Control