DeJong Operations Management & Consulting LLC

Directions Website

DeJong Operations Management & Consulting LLC Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from DeJong Operations Management & Consulting LLC, Business consultant, 228301 Cty Highway M, Edgar, WI.

We're growing our field team!DeJong is hiring an experienced INSTALL WELDER to support the fabrication and installation ...
10/16/2026

We're growing our field team!

DeJong is hiring an experienced INSTALL WELDER to support the fabrication and installation of sanitary process systems at customer facilities across the country.

This hands-on position involves TIG welding sanitary stainless steel tubing and piping, interpreting project plans and P&IDs, and working alongside our field team to deliver safe, quality installations.

We're looking for someone who takes ownership of their work, values precision, and is comfortable working in industrial environments.

A few important details:
• Full-time position based out of Edgar, Wisconsin.
• Travel, including overnight stays, required.
• Experience with sanitary TIG welding is required.
• If not local to Central Wisconsin, must be willing to relocate to Central Wisconsin.

Interested in joining the team, or know someone who might be a good fit?

Explore the full position and apply:
https://dejongconsultingllc.com/careers

The problem you see isn't always the problem you need to solve.In food processing, an issue on the production floor can ...
10/08/2026

The problem you see isn't always the problem you need to solve.

In food processing, an issue on the production floor can often be traced back to something happening elsewhere in the system. Poor flow, undersized utilities, limited access, or inefficient cleaning cycles can all create challenges that show up downstream.

Replacing equipment or addressing the immediate symptom may provide a temporary fix, but without understanding the root cause, the same challenges can continue.

At DeJong, we look at how the entire process works together to identify what's actually holding production back.

Better solutions start with understanding the whole system.

A food plant design must prioritize the people operating it, not just what's convenient for installers.Systems should be...
10/06/2026

A food plant design must prioritize the people operating it, not just what's convenient for installers.

Systems should be accessible and easy to use to avoid long-term challenges.

Prioritizing production, sanitation, maintenance, safety, and team needs leads to success beyond startup day.

The true measure of a project is its performance during live operations when the team relies on it daily.

Workarounds show where the system is making the team compensate for poor design.The goal is not to make people work hard...
10/02/2026

Workarounds show where the system is making the team compensate for poor design.

The goal is not to make people work harder around the process. The goal is to build a process that supports the people doing the work, without compromising efficiency and product integrity.

Identify system inefficiencies with expert operations management and consulting services. Let us help streamline your processes for optimal design and productivity.

Ignoring process inefficiency does not keep costs flat.It usually makes them harder to see.Extra labor, slower cleaning,...
10/01/2026

Ignoring process inefficiency does not keep costs flat.

It usually makes them harder to see.

Extra labor, slower cleaning, wasted product, inconsistent flow, difficult changeovers, delayed projects, and repeated troubleshooting can quietly become part of the daily routine. Over time, the team may stop seeing them as problems because everyone has learned how to work around them.

That is why process audits matter. They help identify what the plant has normalized, what is slowing production down, and where better design or planning could make the operation stronger.

The goal is not to criticize the existing process. The goal is to find practical improvements that support the team and the business.

A process review can help prevent expensive guesses and point the team toward the right solution.
09/24/2026

A process review can help prevent expensive guesses and point the team toward the right solution.

Our take:Plant optimization should happen before a major equipment purchase.New equipment can help, but it may not solve...
09/21/2026

Our take:

Plant optimization should happen before a major equipment purchase.

New equipment can help, but it may not solve poor flow, weak utilities, sanitation bottlenecks, inefficient piping, or a process that was never designed to scale.

In some cases, the better first move is understanding the real constraint before adding more machinery.

Start with the system. Look at what is slowing production down, where waste is happening, what the team has learned to work around, and where the plant is losing capacity.

The answer may still be new equipment. But when that decision comes after a full process review, the investment is more likely to solve the right problem.

Good controls are not just about automation. They help the operation run with more clarity and confidence.
09/17/2026

Good controls are not just about automation. They help the operation run with more clarity and confidence.

We are inspired by practical engineering.Not overcomplicated systems. Not equipment for the sake of equipment. Not desig...
09/14/2026

We are inspired by practical engineering.

Not overcomplicated systems. Not equipment for the sake of equipment. Not designs that look good on paper but make daily production harder.

The best solutions are the ones that make sense in the real world for the people operating the plant every day. That means thinking through sanitation, access, maintenance, flow, utilities, safety, and long-term use.

Our engineers take an ownership mentality to each design. Each piece of equipment must go through an internal qualification process to earn its place in the system.

In the end, good engineering is not just about how a system is built. It is about how well it works after startup.

Food processing facilities need a practical design that supports current operations and future growth.Looking for growth...
09/10/2026

Food processing facilities need a practical design that supports current operations and future growth.

Looking for growth? Let us review your current equipment for new market opportunities.

Address

228301 Cty Highway M
Edgar, WI
54426

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5:30pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when DeJong Operations Management & Consulting LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share