09/08/2026
Drainage, Culvert & Grading
This project included the installation of a 42-inch concrete culvert to provide improved drainage and reliable water flow through the property. We completed the excavation, properly set the culvert, and stabilized both the inlet and outlet with rip rap to help prevent erosion and protect the installation.
We also completed extensive grading and site preparation around the pond, including leveling and shaping the backside of the pond dam to create a smooth, consistent grade and improve drainage across the area.
The project was finished with a new concrete crossing, tying the drainage improvements and grading work together.