08/06/2026
Here is what AI change detection actually catches on a construction site between overflights:
Earthwork volumes that do not match the schedule. Grading planes that will fail drainage inspection. Material stockpiles that are unaccounted for. Structural pours that are out of spec.
All of it flagged with GPS coordinates and deviation measurements before the next site meeting.
This is what protecting a construction schedule looks like from 400 feet up.
Friday: how this translates directly into budget protection.