09/23/2026
Another major paving project completed in Trenton, New Jersey. 🚧
Our crew recently completed this new pavement installation for a girls’ school dormitory project—and this one involved a lot more than just laying asphalt.
We hauled out 18 tri-axle loads of fill dirt, then brought in approximately 300 tons of NJDOT-certified DGA, installed and compacted to a 6-inch finished base.
From there, the main pavement section received 4 inches of compacted 25M64 binder course, followed by 2 inches of compacted 9.5M64 top course asphalt.
One of the most interesting parts of this project is the porous pavement system located in the parking areas on both sides of the main roadway. Beneath these areas is over 20 feet of clean aggregate, designed to allow stormwater to pe*****te through the pavement and into the stone reservoir below while helping the project meet the City’s impervious-coverage requirements. The parking areas received 3 inches of porous asphalt pavement.
At the roadway connection, we installed another 4 inches of 25M64 binder and 2 inches of 9.5M64 top course, then sealed the new-to-existing asphalt joints with hot-applied rubberized asphalt sealant.
Throughout the project, we achieved approximately 92–94% asphalt compaction.
A lot of work underneath the surface goes into building pavement like this correctly. Proper base. Proper drainage. Proper asphalt. Proper compaction.
📍 Trenton, New Jersey