01/11/2026
From a hole in the ground to prepared for flat work… we’ve got you covered every step of the way. This job required preparing stone bases for our footings due to poor native soils. Next we brought in structural fill to raise the sub-grade as needed. Lastly we brought in 8” of stone to prepare for our concrete floor.