08/17/2026
A duct run got routed straight into a beam pocket, and nobody caught it until the steel was already at the shop. 😩
Swipe through — this one cost about a month of rework, and it all traces back to one thing: nobody re-ran clash detection after round 2 got approved. Lock the model. Check every revision, not just the first one. Easiest habit in coordination, and the one that gets skipped the most.
Been there? Or want a second set of eyes on your next fabrication round? Drop us a DM.