10/13/2026
Planning to build? Grade your site with a minimum 2% slope away from the foundation perimeter.
That slope directs rainwater and runoff away from your footings, preventing pooling that can weaken soil, cause settling, or create drainage headaches down the line. A stable foundation starts with proper grading before construction begins.
Need site leveling in the Greeneville area? Visit patriotlandsolutionstn.com