06/20/2026
Precision work in progress 🚧💧
Crews are actively repairing a collapsed sewer main ahead of an upcoming lining project. The failure occurred under the load of an existing chimney tied into a sewer lateral, requiring careful excavation and controlled repair.
Working alongside EM Lofgren Corp, the team is utilizing a slide rail trench shoring system to maintain a safe and stable work zone while restoring critical underground infrastructure.
At, we’re focused on safe ex*****on, reliable coordination, and getting essential utilities back in service efficiently. 👷♂️🛠️