06/06/2024
Seven Heater Sections ranging from 65.3 MT to 219.2 MT rolled onto two barges using 12-line double-wide SPMTs. The Heater Sections were transported from Oklahoma to Texas where they were offloaded and staged on jack stands. The loading, securing, and offloading were to follow the proposed plans and Method Statements.