09/01/2026
Another four garages completed by Rock My Floor last week as we continue to finish out summer strong! 💪🏼
• Rockford — Three-stall garage finished in Gravel flake
• Grand Rapids — Two-stall garage finished in Trailmix flake
• East Grand Rapids — Oversized two-stall garage with a moisture barrier and Creekbed flake
• Kentwood — Two-stall garage finished in Gravel flake
Another great week of transforming concrete!