Qal-Tek Associates

Qal-Tek Associates Qal-Tek provides a wide variety of products and services to help our clients build a better and more

Qal-Tek's Tennessee office is now running weekly routes to GA, AL, TN, and KY. Meet Jake Ohs, the branch manager running...
08/24/2026

Qal-Tek's Tennessee office is now running weekly routes to GA, AL, TN, and KY. Meet Jake Ohs, the branch manager running it.
Four questions. Straight answers. Swipe through.

Schedule your route: qaltek.com/service-information-form

08/21/2026

Walking the new Tennessee facility. Those cement blocks aren't just walls, they're radiation shielding for the NDG service bays. This is where we'll calibrate and repair nuclear density gauges for construction and materials testing crews across the region.

Same ISO 17025 standards, same NRC license, new location.

The Radiation Safety Protection Manual isn't a procedure document.It's the operational nervous system of your radiation ...
08/11/2026

The Radiation Safety Protection Manual isn't a procedure document.
It's the operational nervous system of your radiation protection program. Authorities, responsibilities,
ALARA controls, dosimetry, bioassay, survey requirements, posting, incident response, records management.
Every section gets cross-referenced against your NRC submission.

Qal-Tek authors Radiation Safety Protection Manuals from the ground up for SMR developers, research reactors, DOE site contractors, and industrial licensees. We also audit existing manuals against current NRC and DOE expectations.

If your RSPM is older than your last design revision, it's probably overdue for review.

Qal-Tek is coming to Tennessee.Our new branch opens this October, bringing ISO/IEC 17025 accredited calibration and week...
08/04/2026

Qal-Tek is coming to Tennessee.

Our new branch opens this October, bringing ISO/IEC 17025 accredited calibration and weekly route service to Tennessee, Alabama, Georgia, and Kentucky.

No more shipping your nuclear density gauge across the country and waiting. We pick up on a weekly route, run the full 40-point check, leak test, and calibration traceable to NIST, then return it within five business days

Additionally, this location will service CMT lab equipment with our on-site ISO 17025 accredited calibration and repair technicians. Qal-Tek has been servicing the construction materials testing industry for over 25 years.
Get on the route list before we open: 208-523-5557 or email us at [email protected]

25+ years operating under a broad-scope NRC license. Zero significant violations for full program clients.That's not a m...
08/04/2026

25+ years operating under a broad-scope NRC license. Zero significant violations for full program clients.
That's not a marketing line. It's a documented operational record, and it's the reason industrial companies keep coming back when their compliance is on the line.
If your radiation safety program hasn't been audited against current standards in the last 24 months, the right time to find a gap is before a regulator does. A gap you find is a fix. A gap a regulator finds is a finding.
When was your last full program review? Comment below, or reach us at www.qaltek.com to get one scheduled.

Finalizing your reactor design?Your Radiation Protection Program needs to be further along than most teams think. NRC an...
07/28/2026

Finalizing your reactor design?
Your Radiation Protection Program needs to be further along than most teams think. NRC and DOE expect review-ready documentation by final design certification.

Starting late = RFI's = rework and timeline shifts.

We build Radiation Protection Programs from scratch or audit what your team has drafted. Bioassay, dosimetry, monitoring, waste, emergency response, survey procedures, contamination control, and more. Full program or gap-fill.

Need help? One call scopes the work.

Every post-service survey gets read. What you tell us about turnaround, tech performance, and paperwork is what we fix n...
07/24/2026

Every post-service survey gets read. What you tell us about turnaround, tech performance, and paperwork is what we fix next. We want to thank you for taking the time to help us continually improve. We pick monthly winners to give swag to as a way to show our gratitude.

Four names came out of the June pool - Merch is on the way.

Juan N. –
Matt C. –
Michael C. –
Kris S. –

Filled out a survey recently? You're already in the pool for July.
What's one thing you'd change about how calibration turnaround works?

3 procedures the NRC and DOE will look for in your Radiation Protection Program submission:1. Radiation Bioassay Program...
07/21/2026

3 procedures the NRC and DOE will look for in your Radiation Protection Program submission:

1. Radiation Bioassay Program Procedure
2. Radiation Monitoring Procedure
3. Dosimetry Program

Missing one = delays = weeks added to your timeline.

Qal-Tek's been writing procedures for SMR developers, reactor licensees, and DOE contractors for 25+ years. Zero significant violations. Certified Health Physicists on staff.
Need a second set of eyes on yours before submission?

The NRC requires leak testing on sealed sources every six months. Miss the window and the gauge is out of compliance the...
07/15/2026

The NRC requires leak testing on sealed sources every six months. Miss the window and the gauge is out of compliance the next day, whether anyone notices or not. Most lapses aren't negligence. They're a missed reminder and a provider who didn't call back.
Qal-Tek's mEyeCal tracks every gauge's leak test and calibration cycle and flags it before it lapses, so your next audit finds clean records instead of gaps. Already behind? OSCAR comes to your site for leak testing, no shipping, and we rebuild the documentation that fell through.
One automated reminder is the difference between a clean audit and a violation.
Calibration, leak testing, compliance recovery, and tracking. One vendor, on your site. Stop chasing providers who don't answer.
Get on the mEyeCal schedule: qaltek.com
ISO/IEC 17025 accredited, fixed-lab and on-site.

The full RPP checklist. If your submission is missing any of these, you're not ready.Emergency ProceduresRadiation Bioas...
07/14/2026

The full RPP checklist. If your submission is missing any of these, you're not ready.

Emergency Procedures
Radiation Bioassay Program Procedure
Radiation Monitoring Procedure
Dosimetry Program
Radiation Waste Management Procedure
RADCON Manual + more

Every one of these gets reviewed. Every one of these can trigger a Return for More Information if it's underdeveloped, inconsistent, or missing references to your facility-specific operations. That means delays, rework, and a program that sits in limbo instead of getting approved.
Qal-Tek has authored and reviewed RPP documentation for over 25 years. We know what reviewers flag and how to keep submissions clean.
ISO 17025 accredited. Broad-scope NRC license. Reciprocity in ~50 states.
Contact us today to get your RPP under expert review: www.qaltek.com

Address

3998 Commerce Circle
Idaho Falls, ID
83401

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

(208) 523-5557

Alerts

Be the first to know and let us send you an email when Qal-Tek Associates posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Qal-Tek Associates:

Shortcuts

Share