08/31/2026
We started with a grassy, uneven area along this building and got it stripped down, cleaned up, and prepped for a new concrete pad. We removed the sod, leveled and graded the area, and built a solid base so it was ready for the concrete crew to come in and finish this 30’x75’ pad.
#906