Temporary Wall Systems Puget Sound

Temporary Wall Systems Puget Sound Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Temporary Wall Systems Puget Sound, Business service, 12215 NE 75th Street, Kirkland, WA.

Installing containment on a very short timeline. Phase 1 was installed without an issue and set the stage for future pha...
06/18/2025

Installing containment on a very short timeline. Phase 1 was installed without an issue and set the stage for future phases. This installation went so well that another project manager reached out to us to begin a second job at the medical center.

We’re having an incredible time at the APIC annual conference! It’s been amazing connecting with professionals who are j...
06/17/2025

We’re having an incredible time at the APIC annual conference! It’s been amazing connecting with professionals who are just as passionate about infection control as we are. There’s nothing better than collaborating on smart, safe solutions for occupied renovations.

Creating a containment solution for the replacement of a walking escalator in a busy terminal. Our goal was to secure th...
06/11/2025

Creating a containment solution for the replacement of a walking escalator in a busy terminal. Our goal was to secure the construction area, protect passengers and staff, all while maintaining clear pathways for smooth pedestrian flow.

Here's an ongoing, multiple-phase project at a local hospital. The contractor had originally constructed a Coroplast wal...
06/05/2025

Here's an ongoing, multiple-phase project at a local hospital. The contractor had originally constructed a Coroplast wall to contain two healthcare construction entrances. However, the hospital did not think it was secure enough. The GC contacted us, and we installed our Core walls, which are the perfect application for any healthcare environment.

Temporary Wall Systems recently completed another healthcare renovation containment project. Our team installed 125 line...
05/28/2025

Temporary Wall Systems recently completed another healthcare renovation containment project. Our team installed 125 linear feet of walls with an anteroom and a negative pressure monitor. The client loved the service, and the installation came out beautifully.

Project Spotlight: This customer faced the challenge of combining two different operations into one functioning office. ...
05/21/2025

Project Spotlight: This customer faced the challenge of combining two different operations into one functioning office. We performed a site visit, developed a plan to meet their needs, and installed roughly 73 linear feet of modular walls with a lockable door. The onsite conditions required a quick change to the layout, but being local allowed us to quickly pivot without a delay to the customer's schedule.

Project Spotlight: A community college was undergoing renovations, where noise and student safety were key in multiple a...
05/14/2025

Project Spotlight: A community college was undergoing renovations, where noise and student safety were key in multiple areas of the campus. We got on site and completed the containment in just one day, so renovations could start immediately.

Happy Mother’s Day from all of us at Temporary Wall Systems.
05/11/2025

Happy Mother’s Day from all of us at Temporary Wall Systems.

Project Spotlight:  Temporary Wall Systems St. Louis partnered with The Waldinger Corporation to support the remodel of ...
04/30/2025

Project Spotlight: Temporary Wall Systems St. Louis partnered with The Waldinger Corporation to support the remodel of the flower shop at a Sam’s Club. To ensure minimal disruption to shoppers and staff, the St. Louis team quickly installed modular containment walls outside of business hours. This solution allowed construction to proceed efficiently while maintaining a clean and professional atmosphere.

An Atlanta construction project to transform a warehouse into a retail shopping center was at risk of being delayed by a...
04/28/2025

An Atlanta construction project to transform a warehouse into a retail shopping center was at risk of being delayed by an exposed loading dock. The dock was supposed to be secured by a garage door, but the door was on back order with the supplier. With the dock exposed, valuable equipment could not be secured, and rain could get into the work areas. Temporary Wall Systems proposed a temporary perimeter that would protect the worksite from the elements and intruders. Quick delivery and installation of temporary walls allowed work to continue uninterrupted.

Did you know that the World Health Organization recommends hospitals undergoing renovations use ICRA Class IV temporary ...
04/24/2025

Did you know that the World Health Organization recommends hospitals undergoing renovations use ICRA Class IV temporary wall systems to isolate dust and airborne particles? This ensures an airtight environment with no added construction dust to handle infection control.

Address

12215 NE 75th Street
Kirkland, WA
98033

Alerts

Be the first to know and let us send you an email when Temporary Wall Systems Puget Sound posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Temporary Wall Systems Puget Sound:

Featured

Share