Call Directions Website

CWF Boilers, HVAC, Welding and Manufacturing

Making America great, one boiler at a time!

Brothers, Austin and Coltin Clark, have always dreamed of having a business that they could call their own. With over 17 combined years in the field, Austin and Coltin decided it was time to take it to the next level. They are proud of the hard work they have put in, to make their dream come true. These brothers dedicate themselves in providing a level of excellence in all that they do.

Wrapped and ready to go!For this truck in our fleet, the capabilities it possesses are what makes it stand out, which fo...
10/06/2026

Wrapped and ready to go!

For this truck in our fleet, the capabilities it possesses are what makes it stand out, which for this truck it’s the crane that does the heavy lifting. The goal with this truck is to further our possibilities as contractors and provide even more to our clientele. Especially as we expand to Arizona; this truck will be joining our team located there and provide assistance with our ongoing projects in the area. A huge thank you to Kevin Linson for his amazing job on this truck!

His business can be found at .by.linson on Instagram

This major Las Vegas hospital approached us seeking assistance with their bio-waste processing facility, which was exper...
10/02/2026

This major Las Vegas hospital approached us seeking assistance with their bio-waste processing facility, which was experiencing frequent equipment failures and significant operational challenges. The hospital was concerned about the growing volume of waste that could not be processed within a single shift due to the limitations and unreliability of the existing system. While these issues could be addressed with updated equipment and automation, the most significant challenge was the facility's limited footprint. The waste plant upgrade was part of the larger remodel, and another contractor was actively working within the same space, requiring extensive coordination throughout the project.

After mapping the facility and analyzing workflow requirements, CWF created a process flow design and equipment layout that maximized throughput within the available space. The new system increased processing capacity to 1,800-2,200 pounds per hour, representing a six- to eight-fold increase over the facility's previous capability. Through close collaboration, flexibility, and ongoing communication among all parties, the project team successfully minimized disruptions and accelerated completion. This was particularly important because the hospital was incurring substantial costs to transport and process waste off-site during construction. Following installation, CWF conducted comprehensive onsite training for 40 staff members across all three hospital shifts. The upgraded system dramatically improved processing efficiency. With the ability to process large volumes of waste in approximately 45-minute cycles, staff were able to eliminate waste backlogs and redirect time toward other critical responsibilities.

A local Las Vegas hotel, after conducting a comprehensive review of the property’s mechanical systems, they found out th...
09/25/2026

A local Las Vegas hotel, after conducting a comprehensive review of the property’s mechanical systems, they found out that two of their three existing Raypak domestic hot water boilers were nearing failure.

The project presented several significant logistical and operational challenges. First, the property is located directly across from an airport and within an active flight path. To facilitate rooftop crane operations, we coordinated with a specialty crane contractor that developed FAA flight-line plans for approval through the Department of Aviation. Second, the domestic hot water system is essential to daily hotel operations, because the boilers provide hot water for guest showers, sinks, and facility operations, we had to carefully coordinate equipment staging, demolition, and installation activities to minimize disruptions.

The installation team worked diligently to complete all mechanical, electrical, venting, and control system connections for the first two boilers. To ensure continuous hot water service to hotel guests, we operated on rotating daytime and overnight shifts throughout the project. Once the first two boilers were fully operational, the third existing boiler was decommissioned, dismantled, and removed from the rooftop by hand for transport and disposal. The final Raypak boiler was then staged, installed, piped, wired, and commissioned. The project concluded successfully following the final state inspection and acceptance, establishing a future contract for CWF and supplying this local hotel with a reliable system.

Rental boilers are back and ready to be of service! As winter approaches having our rental boilers available for quick i...
09/22/2026

Rental boilers are back and ready to be of service! As winter approaches having our rental boilers available for quick installation is a large priority, we were able to welcome back our Series 500, 150 HP 150 PSI Steam Boiler which is accompanied by an Sub 30 PPM NOx Burner. As well as bringing back our Mohawk 150 HP 150PSI Dryback Firetube Boiler. For our full inventory of rental boilers, feed water tanks, deaerators, and more, they can be found on our website!

Were gonna need a bigger crane… We’re beginning a new project! This boiler removal and install is going to require some ...
09/17/2026

Were gonna need a bigger crane…

We’re beginning a new project! This boiler removal and install is going to require some heavy lifting, and a roof removal. For this project at a local food production facility we’re replacing their previous boiler and installing a brand new Hurst Boiler & Welding Co., Inc. Series 250W Scotch Marine Boiler. In the meantime we’ve supplied them with a rental boiler keeping their efficiency standard consistent while we continue to work on their new system.

Over the last 25 years America has come together to commemorate the lives lost on September 11th 2001. Year after year w...
09/11/2026

Over the last 25 years America has come together to commemorate the lives lost on September 11th 2001. Year after year we honor the service of all of the first responders, military members, and ordinary civilians who were brave enough to risk their lives for the sake of those in need. For the families of loved ones lost and for those whose lives have never been the same since that day we share our love for our country and our community. We will never forget.

Client connection is one of our biggest priorities at CWF, we believe that creating that bond is crucial in our process....
09/04/2026

Client connection is one of our biggest priorities at CWF, we believe that creating that bond is crucial in our process. We were given the opportunity to provide lunch for one of our clients in the Las Vegas hotel business. Having been working with them for almost a decade we’ve understood their importance in the culture that makes Las Vegas so distinctive. Supporting them in their foundational needs is a priority that we take on proudly and continuing to provide both our consistent service and some tacos for lunch we’ll always care for our clients!

Happy Labor Day! We will be closed Monday September 7th and will resume regular operating hours on Tuesday September 8th...
09/01/2026

Happy Labor Day! We will be closed Monday September 7th and will resume regular operating hours on Tuesday September 8th.

Welding and Fabrication are the foundations of what we do at CWF. As we’ve been able to grow as a company we’ve always r...
08/27/2026

Welding and Fabrication are the foundations of what we do at CWF. As we’ve been able to grow as a company we’ve always relied on our skills in manufacturing to provide the highest quality work and utilizing what we have in equipment keeps us efficient in the custom fabrication process. With our upcoming training facility we’ve been designing and creating standout elements to be incorporated to the finished project. As the development of our training facility continues, the installation of our projects will help create a space that is uniquely ours.

Address

3019 Sheridan Street
Las Vegas, NV
89102

Opening Hours

Monday 7am - 3:30pm
Tuesday 7am - 3:30pm
Wednesday 7am - 3:30pm
Thursday 7am - 3:30pm
Friday 7am - 3:30pm

Telephone

+17026785111

Alerts

Be the first to know and let us send you an email when CWF posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share