05/01/2026
Confused by Lebanon Utilities' announcement today? Here's the plain-English version.
LU released a statement saying the wastewater discharge location shown in their engineering plans — inside Eagle Creek Park — is no longer being considered.
What that means: the pipe. the aeration system, and the discharge structure will NOT be built inside Eagle Creek Park. Community voices were heard.
That doesn’t mean the project is cancelled. LU is still planning to discharge treated wastewater somewhere in the Upper White River Watershed. They just haven't decided (or haven’t told the public) where yet.
We've asked LU directly:
📍 Where are the alternative locations being considered?
📄 Will there be a new public engineering report?
🔔 Has IDEM been notified of the change?
We'll share answers when we get them. Watch this space.