An energy project can be technically sound and still run into trouble if it doesn't fit the facility's day-to-day operations.
That's why the energy consultant and facility manager need to be in conversation before the scope is locked.
The facility manager knows the realities that don't always show up in a utility bill: production schedules, maintenance windows, access constraints, comfort needs, and equipment history.
The consultant brings the energy analysis and project options. The facility manager pressure-tests them against how the building actually runs.
That exchange helps the team plan a project that works not only on paper, but on site.
What's one operational detail you wish every energy project team asked about earlier?