05/27/2026
Gravity system completed for a new build up Washington Creek this last week.
I performed the initial site prep, well drilling prep, amd waterline/power extension on this property last fall, and knew after the rock hammer show it took to punch the waterline in that it was likely to be needed for this phase.
Luckily it only ended up being one vein on the last lateral of the drainfield.
Now back up to Union Valley to wrap up the fuel reduction project 🤘