A severely cracked concrete floor at a Russian candy factory created a safety hazard and risked damage to finished goods...
10/13/2026

A severely cracked concrete floor at a Russian candy factory created a safety hazard and risked damage to finished goods.

After removing loose material and preparing the surface, the ENECON team repaired cracks and voids with DuraQuartz, primed the floor with CHEMCLAD P4C, and applied two coats of ENECLAD FPS.

The result: a restored production floor without replacing the concrete. Repair – Don’t Replace

https://www.enecon.com/pdfs/newsletters/ECL-023-Russian-Candy-Factory-Floor-is-Rehabilitated-Using-DuraQuartz-P4C-ENECLAD-FPS.pdf

Happy Columbus Day from all of us at ENECON. On this day, we also take a moment to recognize Indigenous Peoples' Day and...
10/12/2026

Happy Columbus Day from all of us at ENECON. On this day, we also take a moment to recognize Indigenous Peoples' Day and the history and heritage of Native American communities across the United States.

We hope you enjoy the holiday.

A northeastern U.S. power station restored a severely eroded saltwater circulating pump instead of replacing it. After t...
10/08/2026

A northeastern U.S. power station restored a severely eroded saltwater circulating pump instead of replacing it. After the damaged guide vanes were reinforced, METALCLAD CeramAlloy was used to rebuild the vanes to their original dimensions and protect the entire component. The completed pump was then returned to service—demonstrating how even extensive damage can often be repaired.

https://www.enecon.com/pdfs/newsletters/MT-130-Power-Station-Brings-Salt-Water-Circulating-Pump-Back-to-Life.pdf

No job is too small for ENECON—especially when the results matter to the people who use the space every day.This outdoor...
10/06/2026

No job is too small for ENECON—especially when the results matter to the people who use the space every day.

This outdoor fountain is located in the dining courtyard of a Pennsylvania restaurant housed in a building dating back to the 1700s. After years of service, the fountain’s tiles were coming loose. Matching replacements were difficult to find, and previously replaced tiles did not remain secure for long.

The fountain was drained, all remaining tiles were removed, and the concrete surface was manually prepared with a grinding wheel. Two coats of CeramAlloy CL+AC were then applied to create a durable, seamless surface with resistance to erosion and corrosion.

The project was completed in just four days with minimal disruption to the restaurant. The restored fountain now provides a refreshed focal point for the courtyard—and restaurant management reports that diners compliment the results almost every day.

https://www.enecon.com/pdfs/newsletters/MT-156-Outdoor-Fountain-at-Pennsylvania-Landmark-Building-is-Repaired-with-CeramAlloy-CL-AC.pdf

A major food manufacturer was experiencing serious erosion and corrosion across three industrial chillers. After special...
10/01/2026

A major food manufacturer was experiencing serious erosion and corrosion across three industrial chillers. After specialized surface preparation, METALCLAD CeramAlloy CP+AC was used to rebuild the deteriorated areas, followed by METALCLAD CeramAlloy CL+AC for long-term protection.

All three chillers were completed in just six days, minimizing downtime while delivering significant savings over replacement.

https://www.enecon.com/pdfs/newsletters/MT-130-Power-Station-Brings-Salt-Water-Circulating-Pump-Back-to-Life.pdf

When the maintenance engineers at a major New Jersey casino needed to repair and protect a critical HVAC chiller, they k...
09/29/2026

When the maintenance engineers at a major New Jersey casino needed to repair and protect a critical HVAC chiller, they knew they needed more than just a temporary fix. The equipment operated in a demanding environment where reliability, efficiency, and long-term performance were essential to keeping operations running smoothly.

After evaluating their options, they selected CeramAlloy along with the expertise of the ENECON Mid Atlantic field engineering team to restore and protect the damaged surfaces. The system was rebuilt using advanced polymer composite technology designed to resist erosion, corrosion, and ongoing wear — while helping extend the operational life of the equipment.

The result was a durable, long-term repair solution that not only restored performance, but also helped reduce future maintenance concerns and avoid the cost and disruption of premature equipment replacement.
For facilities where downtime is not an option, proven repair and protection solutions make all the difference. Repair - Don't Replace!

https://www.enecon.com/pdfs/newsletters/MT-062-HVAC_Chiller_Repair_Atlantic_City.pdf

A cooling tower pump at a Midwestern ethanol plant was considered beyond repair due to severe corrosion and cavitation d...
09/24/2026

A cooling tower pump at a Midwestern ethanol plant was considered beyond repair due to severe corrosion and cavitation damage.

Instead of replacing it, the team took a smarter approach.

Using CeramAlloy CL+AC for corrosion protection and reinforcing high-impact areas with DuraTough DL, the pump was restored and protected against future damage.

The results were so strong that a second pump was treated the same way—delivering long-term reliability across the facility.

Sometimes the best solution isn’t replacement. It’s knowing how to repair it right. Repair - Don't Replace!

https://www.enecon.com/MT-197-Mid-Western-US-Ethanol-Plant-Cooling-Tower-Pump-Cavitation-Eliminated

Sustainable Pump Base Restoration with CHEMCLAD XCA large chemical processing and manufacturing company in Western Penns...
09/22/2026

Sustainable Pump Base Restoration with CHEMCLAD XC

A large chemical processing and manufacturing company in Western Pennsylvania relies on a variety of harsh chemicals as part of its daily operations. Over the years, they had tried numerous “chemical-resistant” coatings on their pump bases—with limited success and repeated failures.

Instead of continuing the costly cycle of repair and replacement, they reached out to their local ENECON Dealer for a long-term, sustainable solution.

The recommendation: CHEMCLAD XC.

By properly preparing and protecting the pump bases with CHEMCLAD XC, the facility was able to restore structural integrity, resist aggressive chemical exposure, and extend the life of critical assets. The before-and-after results speak for themselves.
This is what sustainable industrial maintenance looks like—protecting equipment, reducing waste, and avoiding unnecessary replacement costs. REPAIR - DON'T REPLACE!

https://www.enecon.com/pdfs/newsletters/CH-044-Chemical_Co_Salvages_Pump_Bases_with_CHEMCLAD_XC.pdf

Repair, Reclaim, Reinforce & Extend the Life of Metal & Concrete Pipes and TanksAging infrastructure doesn't have to mea...
09/17/2026

Repair, Reclaim, Reinforce & Extend the Life of Metal & Concrete Pipes and Tanks

Aging infrastructure doesn't have to mean costly replacement. ENECON's DuraWrap polymer/carbon fiber reinforced composite was specifically engineered to repair, rebuild, and restore the integrity of deteriorated piping, tanks, and fluid flow equipment — dramatically extending service life at a fraction of replacement cost.

Applied to interior or exterior surfaces, DuraWrap seals and strengthens components without excavation or special tooling. 100% solids. No heat required. Ultra-high tensile strength with extraordinary adhesion.
Real-World Application: A 24" intake pipe at a U.S. Power Plant was leaking below the disc valve. The ENECON solution: bristle blast preparation, a cold-welded curved steel plate using DurAlloy, two layers of DuraWrap Carbon Fiber Pipe Wrap, and a final CeramAlloy CL+AC topcoat — delivering a proven, economical fix without shutdown or replacement.

When yesterday's equipment needs to perform today, DuraWrap delivers. Repair - Don't Replace!

Heat exchangers at a Silicon Valley data center were in trouble after just 18 months of operation. Circulating reclaimed...
09/15/2026

Heat exchangers at a Silicon Valley data center were in trouble after just 18 months of operation. Circulating reclaimed water had accelerated erosion and corrosion to the point where action had to be taken to protect what were essentially still new and expensive components.

The customer called in ENECON NorCal for a long-term solution, and that is exactly what they delivered.

All surfaces were grit blasted to achieve an optimal 4 mil profile. Severely eroded areas were then rebuilt to original specifications using CeramAlloy CP+AC, followed by two coats of CeramAlloy CL+AC to protect against future damage.

The entire turnkey job was completed for less than 10% of replacement cost, saving the customer a significant amount of both time and money.

Think about that for a moment. A complete repair and long-term protection solution for a fraction of what new equipment would have cost, with none of the extended downtime that comes with full replacement.

Sometimes the smartest investment is protecting what you already have. Repair - Don't Replace!

https://www.enecon.com/pdfs/newsletters/MT-132-Silicon-Valley-Data-Center-Selects-ENECON-to-Protect-Heat-Exchangers.pdf

Address

6 Platinum Court
Medford, NY
11763

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+15163490022

Alerts

Be the first to know and let us send you an email when ENECON posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ENECON:

Shortcuts

Share