07/31/2026
A milestone for Alabama Shipyard and the Port of Mobile.
This week, Alabama Shipyard successfully launched AFDM 15 from Dry Dock Alabama, marking the largest vessel launch in Mobile's history.
At 694 feet in length and approximately 12,000 tons, AFDM 15 was carefully transferred onto Dry Dock Alabama before launch. Executing a project of this scale required extensive planning, precision, and coordination every step of the way.
As the only shipyard facility in Mobile capable of launching a vessel of this size, Alabama Shipyard is proud to provide the expertise and infrastructure needed to support some of the maritime industry's most complex operations.
A huge thank you to our team for their hard work, professionalism, and dedication in making this historic launch a success.