05/07/2026
Control cables rarely fail in CAD. They fail in routing. Tight bend radius, too many bends, and side loading at the conduit exit can drive high effort, lost motion, and early wear. Write routing rules into the spec, then validate them with a prototype build. That is how you get consistent feel and predictable output travel in the real world.
https://loom.ly/SNclAX4