This project was a Plunge Sauna XL assembly. The build was a little different than expected, but overall it wasn’t too difficult. The biggest challenge was troubleshooting the LED lighting system and rewiring components, which actually took more effort than the assembly itself.
The assembly was straightforward. Diagnosing and fixing the electrical issue is where experience made the difference. In the end, everything was assembled, tested, and fully operational.
Another successful installation completed for a satisfied customer.