BlueStar Business Park

BlueStar Business Park Blue Star Business Park is a premier master-planned commercial development located in Southeastern M

🚧 Exciting progress at our warehouse! 🚧 We’re thrilled to announce that drywall installation is underway! @
10/24/2024

🚧 Exciting progress at our warehouse! 🚧 We’re thrilled to announce that drywall installation is underway! @

Work has begun on building 12 for the IDI Distributors Fitup
10/02/2024

Work has begun on building 12 for the IDI Distributors Fitup

Are you looking for warehouse space? 60,000SF available at Bluestar Business Park!
01/04/2024

Are you looking for warehouse space? 60,000SF available at Bluestar Business Park!

Merry Christmas from our family to yours!
12/25/2023

Merry Christmas from our family to yours!

Gather with grateful hearts today and everyday.
11/23/2023

Gather with grateful hearts today and everyday.

11/09/2023

Phase II at BlueStar Business Park is nearing completion!

Yale Appliance building is now complete at Bluestar Business Park in Norton, MA πŸ‘·β€β™‚οΈ
10/17/2023

Yale Appliance building is now complete at Bluestar Business Park in Norton, MA πŸ‘·β€β™‚οΈ

Construction Update 10/2 – 10/13Begin line striping in parking lots/roadMiscellaneous hydroseedingBuilding 9Construction...
10/04/2023

Construction Update 10/2 – 10/13

Begin line striping in parking lots/road
Miscellaneous hydroseeding

Building 9

Construction: Continue caulking Ductile saw cuts
Complete installation of metal panels
Finish install of final dock leveler
Start painting punch list
Install lighting at metal panels (week of 10/9)

Building 12

Site work: Complete installation of signage
Hydroseed disturbed areas

Construction: Begin installation of bollards at dock doors
Begin metal panel installation (week of 10/9)
Begin painting bollards and guards (week of 10/9)
Begin caulking around doors frames and windows
Complete domestic water installation
Continue installing switchgear

Construction Update 9/11 – 9/22Complete reseeding of disturbed areasInstall monument sign for Building 12Building 9Site ...
09/14/2023

Construction Update 9/11 – 9/22

Complete reseeding of disturbed areas
Install monument sign for Building 12

Building 9

Site work: Complete all irrigation and set time clocks
Begin raising manhole covers for final paving

Construction: Begin joint filling interior saw cuts (week of 9/11)
Begin metal panel installation
Complete wiring motors, dock levelers and garage doors
Complete paint touchup
Complete door and hardware installation
Continue elevator assembly
Complete fire alarm testing
Begin installing HVAC controls
Begin testing of backup life safety system, BDA system and programming on electrical panel

Building 12

Site work: Complete all irrigation and set time clocks
Complete plantings
Begin raising manhole covers for final paving

Construction: Complete ductile slab
Finish installation of garage bumpers/holsters/bottom seal
Paint frames and doors
Complete hardware installation
Finish caulking doors and frames
Install switchgear upon arrival

Construction Update 8/28 – 9/8Begin installation of signage on interior and exterior of buildingsBegin plantings near so...
08/31/2023

Construction Update 8/28 – 9/8

Begin installation of signage on interior and exterior of buildings
Begin plantings near soundwall
Rake and hydroseed parking lot islands

Building 9

Site work: Set gates at Janet Street (upon delivery)

Construction: Continue grinding and cleaning concrete, affixing caps
Install countertops
Begin metal panel installation (week of 9/4)
Install bollards and holsters for chalk blocks
Finish misc painting (CMU, stair wells, walls)
Finish tile in bathrooms
Complete door and hardware installation
Complete ACT ceilings
Complete interior and exterior caulking
Start elevator assembly

Building 12

Site work: Clean materials off site and regrade washed out areas
Begin cleaning slab
Begin plantings around building (week of 9/4)

Construction: Begin placing Ductile interior slabs (week of 9/4 and 9/11)
Begin install of bumpers, levelers and seals for docks
Install frames and glass at front entryway
Continue installing gas pipe hold downs
Continue hanging doors and installing hardware
Complete domestic water
Install stack pipe for fire pump (week of 9/4)
Begin switchgear installation (upon delivery – week of 9/4)

Construction Update 8/21 – 9/1 Continue tree and shrub plantings around site Continue guardrail installation Remove silt...
08/24/2023

Construction Update 8/21 – 9/1

Continue tree and shrub plantings around site
Continue guardrail installation
Remove silt fencing around site
Hydroseed washed out locations

Building 9

Site work: Continue bollard and sign installation
Construction: Clean interior flooring
Prep for Ductile slab sealant
Begin millwork installation
Metal panel installation to begin week of 8/28
Begin installation of dock seals and begin wiring motors
Continue painting misc items (bathrooms, stairs, CMU)
Complete tile in bathrooms
Begin 2-hour drywall in BDA shaft
Complete installation of water in bathrooms and office bubblers
Complete sprinkler drops in ACT ceilings
Complete interior lighting installation

Building 12

Site work: Clean area and prep for rumble strip
Install well irrigation

Construction: Complete caps on walls and clean levelers of concrete
Begin installation of dock equipment
Begin installation of glass front doors
Continue installing gas pipe hold downs
Continue bringing in domestic water to building

Phase 2 of Bluestar Business Park is progressing fast. The future home of Yale Appliance is looking great, only 60,000SF...
08/11/2023

Phase 2 of Bluestar Business Park is progressing fast. The future home of Yale Appliance is looking great, only 60,000SF available! Check out our website for construction updates! https://www.bluestarbizpark.com/

Address

15-48 Leonard Street
Norton, MA
02766

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+17815524202

Alerts

Be the first to know and let us send you an email when BlueStar Business Park posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to BlueStar Business Park:

Share