10/11/2026
26 tri-axle loads. Thatβs how much timber and brush we just hauled off this new home site! π³π
The original site prep crew left the yard full of stumps and the property lines piled high with debris. We were called in to get it dialed in. Stumps dug out, brush hauled off, and the site finally prepped the right way. We tracked out a solid rough grade so the concrete crew can get in here, pour the basement, and start going vertical on this home. When you need it done right, you know who to call. ππ