08/21/2026
Another building pad completed!
This one started out rough, with an old leaking drain line running underneath the future build site. We removed the problem, built the new pad, installed a French drain, and laid a main line to handle the French drain and future gutter drains.
A lot of the important work happens underground — proper drainage and preparation now can save headaches later.
Todd-270-316-1557
Jack-270-314-7705